Quote:
Originally Posted by AwesomeSAView View Post
Isn't it beautiful??
"A Phoenix Will Arise From The Ashes"........


Kevin, it is a development called The St Mary's Lofts. The lofts will be rentals, and I believe they have plans for the shorter building towards the back as well.
That's great. I'll be looking forward to seeing it the next time I'm in San Antonio. I'm also curious to see if they put any kind of decorative lighting on it to take advantage of that facade.
__________________
Donate to Donald Trump's campaign today!

Thou shall not indict
Reply With Quote
     
     
  #5062  
Old Posted Sep 13, 2017, 7:18 PM
ArizonaGuy ArizonaGuy is offline
Registered User
 
Join Date: Dec 2007
Posts: 71
Quote:
Originally Posted by AwesomeSAView View Post
Correction:

There are 4 cranes in downtown SA!
Never thought I would see the day, and still waiting for more!!!
So Frost Tower is one or two cranes?
What are the other two cranes downtown for?
Reply With Quote
     
     
  #5063  
Old Posted Sep 13, 2017, 7:47 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,469
Quote:
Originally Posted by ArizonaGuy View Post
So Frost Tower is one or two cranes?
What are the other two cranes downtown for?
Frost: 2
Hampton Hotel: 1
Apts @ 9th and Ave B: 1
Reply With Quote
     
     
  #5064  
Old Posted Sep 14, 2017, 5:34 AM
Spoiler's Avatar
Spoiler Spoiler is online now
Registered User
 
Join Date: Dec 2011
Posts: 917
Holy cow, some crazy news about the Merchants Ice complex.

“With more than 110,000 sq. ft. in five structures on almost five acres, it gives us the perfect place to establish a new innovation hub for small and start-up companies in San Antonio while also modernizing those facilities and contributing to the economic development on the Eastside,” Harig said.

https://therivardreport.com/texas-re...vation-center/
Reply With Quote
     
     
  #5065  
Old Posted Sep 14, 2017, 3:25 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,469
Yes! I saw the SA Business Journal article but i don't pay for it.
Glad something is coming along with this building! There's a lot of space on that side and that railroad will make a perfect candidate for rail in the future.

Last edited by jaga185; Sep 18, 2017 at 1:51 AM.
Reply With Quote
     
     
  #5066  
Old Posted Sep 16, 2017, 7:24 AM
Daren Daren is offline
Registered User
 
Join Date: Nov 2007
Location: Texas
Posts: 79
Trump Tower ?
Reply With Quote
     
     
  #5067  
Old Posted Sep 28, 2017, 4:54 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,469
Aztec will be hotel instead of apts.

41 rooms with a rooftop terrace and restaurant.
Reply With Quote
     
     
  #5068  
Old Posted Sep 28, 2017, 8:01 PM
PDD's Avatar
PDD PDD is offline
Registered User
 
Join Date: Jul 2016
Location: San Antonio
Posts: 59
This one is turning into a beauty

More removal work has been done this week

Reply With Quote
     
     
  #5069  
Old Posted Oct 7, 2017, 1:32 PM
targusblack targusblack is offline
Registered User
 
Join Date: Dec 2009
Posts: 4
Shops at Rivercenter Update

Under the HDRC current Agenda Item #6 is a Master Signage amendment. Figure nothing to exciting though it shows placement of the Lego Discovery and Sea Life attractions coming in spring 2018 inside Rivercenter. Interesting and awesome to see Ashkenazy is really maximizing the use of space.

HDRC Link:
https://sanantonio.legistar.com/Legi...4-DE901BDF8E55

News article for reference:
http://www.mysanantonio.com/business...t-11052249.php
Reply With Quote
     
     
  #5070  
Old Posted Oct 7, 2017, 2:08 PM
Fryguy Fryguy is offline
Registered User
 
Join Date: Jul 2017
Posts: 636
Quote:
Originally Posted by PDD View Post
More removal work has been done this week

Can you repost what you are referring to? Nothing shows.
Reply With Quote
     
     
  #5071  
Old Posted Oct 9, 2017, 2:30 PM
Fireoutofclay's Avatar
Fireoutofclay Fireoutofclay is offline
Weapon of Mass Creation
 
Join Date: May 2009
Location: San Antonio
Posts: 294
The latest on San Antonio’s biggest construction projects
By Richard Webner
http://www.expressnews.com
October 8, 2017
http://www.expressnews.com/real-esta...photo-14301516

Quote:
So many developments have been announced recently, in fact, that it’s hard to keep track of them all. But many projects are behind schedule due to design changes, unexpected complications in construction, or delays in getting approval from local governments, developers said.

Here’s a look at where several large projects stand.
Reply With Quote
     
     
  #5072  
Old Posted Oct 9, 2017, 7:08 PM
Restless 1 Restless 1 is offline
Registered User
 
Join Date: Apr 2010
Posts: 437
Quote:
Originally Posted by Fireoutofclay View Post
The latest on San Antonio’s biggest construction projects
By Richard Webner
http://www.expressnews.com
October 8, 2017
http://www.expressnews.com/real-esta...photo-14301516
Saw this yesterday. There's some good information there, and some answers to many questions asked here ask about delays.

Unfortunately, the article is only available to subscribers. I was lucky enough to see it in the paper yesterday.

One interesting thing I did not know, is that JMJ Tower will actually be 4 stories shorter due to the garage now being separate, instead of the tower sitting on top of that.

Perhaps that will allow ground level retail into the picture.
Reply With Quote
     
     
  #5073  
Old Posted Oct 9, 2017, 9:57 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,469
Found the article online.

Quote:
Dozens of major construction projects are under way in San Antonio as the local housing market soars and developers rush to construct hotels, apartment complexes and office buildings downtown.


There are already a few construction cranes looming over San Antonio’s skyline, and if everything goes as planned there will be almost a half-dozen more within the next year.

So many developments have been announced recently, in fact, that it’s hard to keep track of them all. But many projects are behind schedule due to design changes, unexpected complications in construction, or delays in getting approval from local governments, developers said.

Here’s a look at where several large projects stand.

Essex Modern City

What is it: A $150 million mixed-use development just east of downtown with 80,000 square feet of creative office space, 65,000 square feet of retail, 248 apartments, 160 condominiums, 80 townhomes and a food hall.

Original plans: Local developer Efraim Varga and investment firm Harris Bay of California said earlier this year that they expected to break ground by the end of this year.

Current status: The developers are about six months away from being done with the project’s design, said Jake Harris, co-founder of Harris Bay. They’re negotiating with Union Pacific to create a “quiet zone” along the railroad track that runs alongside the property and hope to break ground around the beginning of next year, he said.

“There’s a brand new mayor and council members, and they’ve been very busy with passing a city budget,” he said.

Harris and Varga plan to finance the project with a combination of bank loans and by teaming up with other partners. They have tentative financing agreements for some portions of the project, he said. It could take 3 years to 5 years to complete, Harris said.


The Arts residences

What is it: A $116 million high-rise with 167 premium hotel rooms and 58 condominiums.

Original plans: When the project was announced in 2016, its leaders said they expected to complete it by 2019.

Current status: The project will break ground in the fourth quarter of this year and is still set to be finished in 2019, said Lesley Hile Ford, a spokeswoman for development firm DC Partners, in an email.

The firm has brought on Jordan Foster Construction as a general contractor, and 35 percent of the tower’s condominiums already have been sold, Ford said. DC Partners is considering adding another floor due to increased demand, she said.

100 N. Main hotel and office tower

What is it: A roughly $45 million tower on Main Plaza with 45,000 square feet of office space and 184 rooms from the boutique Cambria hotel brand.

Original plans: Local hotel development group REM Hospitality said they wanted to break ground in December of last year.

Current status: The developers now hope to start construction around April, said Anand Bhakta, one of the partners in REM. But the groundbreaking could end up later because they are working with the city to make sure the construction doesn’t interfere with festivities for San Antonio’s tricentennial, he said.

The project made it through the city’s historic approval process, but it is awaiting a signature from Mayor Ron Nirenberg to qualify for the federal government’s EB5 program, which allows foreigners to invest at least $500,000 in a development in order to get a green card, Bhakta said. Nirenberg needs to certify that the project is in an area with high unemployment for it to qualify.


Canopy by Hilton hotel

What is it: Chris Hill, the owner of Esquire Tavern, plans to build a 197-room, 138,000 square-foot hotel on East Commerce Street downtown.

Original plans: Construction was expected to begin around August of last year.

Current status: Demolition of a building that was formerly on the property is almost complete, and construction of the tower is set to begin in the next few weeks, said Patrick Shearer, president of Hill’s development company. He expects it to be complete in late 2019.

Hill parted ways with the project’s original general contractor, Harvey-Cleary, which is being replaced by Sundt Construction, Shearer said.

“We just feel like it would be a better fit for the next stage of the project,” he said.

Explaining the delay in the tower’s construction, Shearer said, “this is a complicated building on a tight site, and it’s taken some extra time to make sure we get it right. But we’re ready now.”

Milam building

What is it: Weston Urban, the local development firm that is building the Frost Tower, bought the historic 21-story Milam Building in March 2016 with plans to renovate it, possibly with office space or apartments.

Current status: The development firm is still focused on designing the building’s renovations, Weston Urban President Randy Smith said.

“You’ll see construction activity gin up in 2018,” he said.“A building as unique as the Milam requires an atypical amount of focus and consideration.”

CPS Energy’s new headquarters

What is it: In summer 2016, CPS Energy bought two dormant towers on the River Walk to renovate into a state-of-the-art new headquarters.


Original plans: The utility originally said it plans to start renovation work this year and to move its offices into the towers by 2019.

Current status: CPS currently plans to move into the towers in 2020, said spokesman Jonathan Tijerina. The utility is negotiating the project’s guaranteed maximum price with its construction manager, Sundt Construction, he said. That would set a cap on the project’s cost, after which Sundt would be responsible for cost overruns.

GrayStreet’s Light Building development

What is it: Local developer GrayStreet Partners bought the Light building complex from Hearst, the publisher of the Express-News, in December 2016 with plans to turn it into creative office space.

Original plans: Construction work on the Light building was expected to begin in spring 2017 and to wrap up within a year.

Current status: GrayStreet expects to go before the city’s Historic and Design Review Commission for final approval of its plans for the Light building in the next two months, Director of Development Peter French said. The firm is currently cleaning up the property. He’s not sure when renovations will begin.

Earlier this month, CaptureRX announced it planned to move its headquarters into the Light building.

GrayStreet’s Kress and children’s museum buildings

What is it: GrayStreet announced plans in July 2016 to turn the Kress building and the former children’s museum on Houston Street into a retail and office hub, with about 80,000 square feet of office space and a food hall.

Original plans: The firm originally planned to start renovation work in November or December of last year.

Current status: GrayStreet is still refining the design of the renovations to the buildings, French said. The start date for construction depends on when the firm signs up tenants, he said. The firm has been in talks with some potential large tenants.

“The number of folks that we’re talking to is increasing, if anything. That’s all very positive,” French said. He said they have interest from suburban retailers “who are feeling more confident about exploring downtown, so that’s encouraging.”

Villita tower

What is it: A tower on the River Walk with 221 apartments and 4,000 square feet of class A office space.

Original plans: The developer, Dallas-based JMJ Development, originally expected to break ground in late 2016.

Current status: Demolition of an existing building on the property will begin on October 15, said Tim Barton, JMJ’s chief executive. He expects construction to begin in about nine months and to take nearly two years.

The firm recently bought a nearby building where it plans to construct a parking garage, he said. That will make it easier to design the tower, he said; previously, the firm planned to build an automated parking garage underneath the apartments.

The change of plans delayed the project, though, because JMJ has to redo design work, Barton said. Removing the parking garage from the main tower will also reduce its height by four stories from its original 32-story height, he said.

Development on city, county land in west downtown

What is it: In spring 2016, the city and county started the process of seeking bids to redevelop more than 8 acres of prime downtown real estate, including a few parking lots, the Central Texas Detention Facility and the 19th century Continental Hotel. It’s unclear how long the process was originally expected to take.

Current status: The city and county are preparing to seek proposals from developers to build on about 6.6 acres of the original footprint, according to an email from Kelly Saunders, a spokeswoman for the city’s Center City Development and Operations department. They are hoping for a developer to build a mixed-use development with workforce housing, office space, retail and parking. The request for proposals is expected to be issued in early to mid-2018, the statement says.

The city plans to issue a separate request for proposals for the Continental Hotel property, Jacks said in the statement.

St. Mary’s Flats

What is it: Local developer Craig Glendenning plans to rehabilitate two derelict historic buildings — the 10-story Hedrick tower and a two-story building — at 601 N. St. Mary’s St. into a complex of 54 high-end apartments and retail known as St. Mary’s Flats.

Original plans: In January, Glendenning said rehabilitation work would take between 18 months and 2 years, but it was unclear when it was expected to begin.

Current status: The developers are almost done removing the 60s-era facade to the Hedrick building, revealing the terracotta decorations from its original exterior from the 1920s. There has been some damage to the decorations, and the developers plan to use imaging technology to recreate the broken portions, Glendenning said.

“It ain’t going to be easy, and it ain’t going to be cheap,” he said. “I’m afraid to even think about it.”

The developers have started demolishing a building in between the two historic buildings to make way for a courtyard. But they still have to go through the Texas Historical Commission and the city’s Historic and Development Review Commission for approval of some aspects of the project, Glendenning said.

He predicted it will be between 60 and 90 days before they commence with renovation work on the Hedrick building. Overall, the project should take between 18 months and two years.

Houston Street tech offices

What is it: Local developer David Adelman of AREA Real Estate plans to renovate the vacant five-story building at 401 E. Houston St. into about 40,000 square feet of creative office space.

Original plans: Renovation work was expected to begin in summer 2017 and to wrap up around the end of the year.

Current status: Adelman said he is working on getting building permits and is bidding construction work to subcontractors. It took longer than expected to finish the building’s design, he said. Renovation work should begin no later than November 1.

He hopes to finish renovating one of the building’s floors by March 1, and to complete the whole building sometime next spring.

Interest in the building from potential tenants is “looking pretty strong,” he said.

Acequia Lofts

What is it: Adelman is also building an eight-story, $25 million apartment complex with 150 units at Hemisfair.

Current status: The complex is currently under construction, and workers are drilling 140 piers into the ground in order to stabilize the building, Adelman said. The piers need to be more than 70 feet deep to go beyond the groundwater below the surface downtown, he said.

The complex is currently set to be complete in 2019, he said.
Reply With Quote
     
     
  #5074  
Old Posted Oct 10, 2017, 12:42 AM
PDD's Avatar
PDD PDD is offline
Registered User
 
Join Date: Jul 2016
Location: San Antonio
Posts: 59
Hedrick Building
Before:


After:
Reply With Quote
     
     
  #5075  
Old Posted Oct 10, 2017, 11:36 AM
Restless 1 Restless 1 is offline
Registered User
 
Join Date: Apr 2010
Posts: 437
Thanks Jaga

Quote:
Originally Posted by jaga185 View Post
Found the article online.
"Villita tower

What is it: A tower on the River Walk with 221 apartments and 4,000 square feet of class A office space.

Original plans: The developer, Dallas-based JMJ Development, originally expected to break ground in late 2016.

Current status: Demolition of an existing building on the property will begin on October 15, said Tim Barton, JMJ’s chief executive. He expects construction to begin in about nine months and to take nearly two years.

The firm recently bought a nearby building where it plans to construct a parking garage, he said. That will make it easier to design the tower, he said; previously, the firm planned to build an automated parking garage underneath the apartments.

The change of plans delayed the project, though, because JMJ has to redo design work, Barton said. Removing the parking garage from the main tower will also reduce its height by four stories from its original 32-story height, he said."


This is to what I was referring. Just makes me wonder if the the removal of the garage from the main tower gives us an opportunity for ground floor retail in what will certainly be a pedestrian heavy area. I thought the automated garage was an overreach at this time.
Reply With Quote
     
     
  #5076  
Old Posted Oct 10, 2017, 12:36 PM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location:
Posts: 8,843
Quote:
Originally Posted by PDD View Post
Hedrick Building
Before:


After:
Much better!


Quote:
Originally Posted by Restless 1 View Post

This is to what I was referring. Just makes me wonder if the the removal of the garage from the main tower gives us an opportunity for ground floor retail in what will certainly be a pedestrian heavy area. I thought the automated garage was an overreach at this time.
Hope so.
Reply With Quote
     
     
  #5077  
Old Posted Oct 15, 2017, 9:10 PM
SAinthe21stC SAinthe21stC is offline
Registered User
 
Join Date: Sep 2015
Posts: 24
Not sure if I missed any mentions in other threads, but could anyone provide an update on the various demolitions/construction projects happening on Flores St? Mainly between CAST High School and Houston St. I've counted at least three active construction projects. Especially welcoming to that eyesore on Flores and Pecan.

Also, any updates on the proposed project across from the Bexar County Justice Center on Dolorosa and Flores?
Reply With Quote
     
     
  #5078  
Old Posted Oct 16, 2017, 4:19 AM
Fryguy Fryguy is offline
Registered User
 
Join Date: Jul 2017
Posts: 636
Quote:
Originally Posted by JACKinBeantown View Post
Much better!




Hope so.
This is freaking beautiful! And it's not brown/grey and dingy looking. It's something else, and it's like a whole new building for San Antonio. It's kind of awesome. I cannot wait to see it with Windows. Wow...
Reply With Quote
     
     
  #5079  
Old Posted Oct 16, 2017, 3:19 PM
Sigaven Sigaven is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,477
Quote:
Originally Posted by Fryguy View Post
This is freaking beautiful! And it's not brown/grey and dingy looking. It's something else, and it's like a whole new building for San Antonio. It's kind of awesome. I cannot wait to see it with Windows. Wow...
It is kinda brown, but beautiful nontheless. I think it'd be awesome if they paint the terra cotta ornaments in bright colors to add some spice to the building.
Reply With Quote
     
     
  #5080  
Old Posted Oct 19, 2017, 4:49 PM
jaga185's Avatar
jaga185 jaga185 is offline
James
 
Join Date: May 2004
Location: San Antonio, Tx
Posts: 2,469
Conceptual renderings released of the Merchant Site.








*Photos from RivardReport
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > San Antonio
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:37 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.