Some recent updates:


The Torch:


Quote:
Originally Posted by High Times View Post
The side wall will ascend the side of the podium and the ramps for parking will be in those cut outs of the floor levels.



The final podium level.
The moulds (surrounded by yellow) are in place, the supporting pillars for the last podium level. The moulds encase the steel rebar until the concrete is poured in. The rebar is what reinforces the concrete.



Three of the four podium floors are still supported to give the concrete more time to cure.



This picture shows the steel bars sticking out above the slip form. This shows preparation for the next slip, which will lift the core by around another 2 metres.



View from The Torch site towards Grosvenor House.
The side wall of the podium is under construction. The cut out section of the podium floors is where the ramps for each car park level will be created.



The Torch site from the Grosvenor House hotel terrace
The 4 podium levels that have been completed are clearly visible. The double height of the ground floor is for the Torch lobby and entrance of the building.
The core is already past the height that the podium level will be.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:41 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.