HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations

Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Aug 9, 2015, 4:29 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,466
Cool CHICAGO | Highrise Projects & Construction, v7

Welcome to v7 of the Chicago Highrise Boom thread. - Here’s a link to the previous version of this page: CHICAGO: boom rundown - everything over 12 floors. v6

After a prolonged dip in development and construction during the leanest years of the Global Recession, the construction boom is back in full effect - while clearly not (yet) as prolific as the early 2000s, highrise activity has picked up considerably since 2013. Click on the individual building names to be taken to the corresponding Phorio building page to learn more and see pics/renderings. You can also click on the word “website” at the end of each building entry line in the list to be taken to the official project website to learn even more and for developer/marketing contact information. The buildings are ranked according to the structural height per the guidelines of Phorio. Where no roof height is listed, it is either unknown or the structural height and the roof height are one and the same.

A couple of quick notes on version 7:

- The 'Recently Completed' list will primarily reflect the new construction boom - the previous list is still accessible in version 6 of this rundown.

- Individual skyscraper thread links have been moved to the bottom of the rundown and will be updated to reflect current construction projects, plus new and forthcoming proposals.

- the 'Proposed' section of renderings has a status next to each project, whether they are 'Active' or 'Dormant' proposals. Any dormant proposals that are cancelled will be removed from the Boom rundown.

Please feel free send a private message or directed post in the thread for any updates or modifications to the page 1 list. A concerted effort will be made to make sure page 1 is always up to date. Many thanks to all of the contributors, custodians and photographers of this thread among others, for all of your painstaking work in showcasing Chicago's beautiful skyline.


Chicago's building boom:


color code:
red = over 1,000 ft
magenta = 700 - 999 ft
purple = 600 - 699 ft
blue = 500 - 599 ft
green = 400 - 499 ft
brown = 300 - 399 ft
Black = under 300 ft or unknown


     name                                   use          struct. ht.     roof ht.    floors     year


Under Construction:
  1. 451 East Grand                      res./hotel        850 ft        ... ..       68       ____     
  2. 150 North Riverside                 office            752 ft        ... ..       53       2016     
  3. River Point                         office            730 ft        ... ..       52       ____     
  4. Optima Chicago Center II            residential       587 ft        ... ..       53       ____     
  5. CNA Center                          office            568 ft        ... ..       36       ____     
  6. Wolf Point, West Tower - TO         residential       493 ft        ... ..       48       2016     
  7. 200 North Michigan - TO             residential       488 ft        ... ..       45       2016     
  8. 545 North McClurg - TO              residential       486 ft        ... ..       45       ____     
  9. The Ability Institute of RIC - TO   hospital          480 ft        ... ..       27       2017     
  10. Marriott Marquis McCormick Place    hotel             444 ft        ... ..       40       ____     
  11. The Sinclair (Tower of Jewel)       residential       443 ft        ... ..       35       2017     
  12. 9th and State                       residential       ___ ft        ... ..       41       ____     
  13. 167 West Erie                       residential       408 ft        ... ..       39       ____     
  14. Marquee at Block 37 - TO            residential       400 ft        ... ..       38       ____     
  15. 720 North LaSalle                   residential       382 ft        ... ..       35       ____     
  16. 833 North Clark                     residential       380 ft        ... ..       34       ____     
  17. No. 9 Walton                        residential       ___ ft        ... ..       35       ____     
  18. 215 W Lake                          residential       348 ft        ... ..       33       ____     
  19. Atrium Village Phase 1              residential       341 ft        ... ..       32       ____     
  20. 4 East Elm - TO                     residential       335 ft        ... ..       25       2016     
  21. 730 West Couch - TO                 residential       320 ft        ... ..       29       ____     
  22. 1035 West Van Buren                 residential       ___ ft        ... ..       30       ____     
  23. Next at 347 West Chestnut           residential       299 ft        ... ..       28       2017     
  24. 640 North Wells                     residential       280 ft        ... ..       22       ____     
  25. 1333 South Wabash                   residential       ___ ft        ... ..       28       2015     
  26. 750 North Hudson                    residential       240 ft        ... ..       25       ____     
  27. London Guarantee Addition - TO      hotel             285 ft        267 ft       22       ____     
  28. 108 North Jefferson                 hotel             250 ft        ... ..       23       ____     
  29. City Hyde Park  - TO                residential       173 ft        ... ..       15       ____     
  30. 2950 North Sheridan                 residential       215 ft        ... ..       19       ____     
  31. 226-228 East Ontario                hotel             218 ft        ... ..       17       ____     
  32. Niche 905 (905 N. Wells)            residential       185 ft        ... ..       17       ____     
  33. 625 West Division - TO              residential       ___ ft        ... ..       16       ____     
  34. Webster Square                      residential       152 ft        ... ..       12       ____     
  35. 2293 North Milwaukee - TO           residential       ___ ft        ... ..       15       ____     
  36. University of Chicago Dormitory     residential       ___ ft        ... ..       15       ____     
  37. Kenect (500 North Milwaukee) - TO   residential       ___ ft        ... ..       15       ____     
  38. 400 West Huron                      residential       ___ ft        ... ..       15       ____     
  39. NU Biomedical Research Ctr.         hospital          ___ ft        ... ..       15       2019     
  40. Vue53 - TO                          residential       ___ ft        ... ..       13       ____     

“TO” indicates that the building has been topped out





Site Prep/Demo:
  1. 590 West Madison                    office/hotel      582 ft        ... ..       44       ____
  2. 1001 West Chicago                   residential       205 ft        ... ..       __       ____     
  3. State and Huron                     residential       ___ ft        ... ..       30       ____     
  4. Viceroy Hotel                       hotel             ___ ft        ... ..       18       ____     




Proposed:*
  1. Wanda Vista                         res./hotel       1186 ft        ... ..       98       2019     
  2. Wolf Point, South Tower             office          ~1100 ft        ... ..       __       2018     
  3. 113 E. Roosevelt                    residential       887 ft        ... ..       70       ____     
  4. 1000 S. Michigan                    residential       832 ft        ... ..       73       ____     
  5. 130 North Franklin                  office            752 ft        ... ..       53       ____     
  6. Wolf Point, East Tower              office            750 ft        ... ..       60       2020     
  7. 201 North Columbus                  res./hotel        642 ft        ... ..       __       ____     
  8. Essex Inn addition                  hotel             575 ft        ... ..       55                 
  9. 465 North Park                      residential       535 ft        ... ..       45       ____     
  10. 1300 S. Michigan                    residential       490 ft        ... ..       48       ____     
  11. Atrium Village Phase 4              residential       420 ft        ... ..       44       ____     
  12. Atrium Village Phase 3              residential       410 ft        ... ..       41       ____     
  13. Atrium Village Phase 2              residential       380 ft        ... ..       36       ____     
  14. 330 North Clark                     residential       377 ft        ... ..       __       ____     
  15. 1028 North Dearborn                 residential       365 ft        ... ..       29       ____     
  16. Weed and Fremont                    residential       339 ft        ... ..       31       ____     
  17. 1061 West Van Buren                 residential       330 ft        ... ..       32       ____     
  18. McHugh Hotel (Chinatown)            residential       320 ft        ... ..       27       ____     
  19. 1136 South Wabash                   residential       304 ft        ... ..       29       ____     
  20. Chicago and Cambridge               residential       300 ft        ... ..       __       ____     
  21. State & Lake                        residential       ___ ft        ... ..       31                 
  22. River South South                   residential       ___ ft        ... ..       29 & 19            
  23. Printers Row tower                  residential       ___ ft        ... ..       24                  
  24. 3Eleven Illinois                    residential       ___ ft        ... ..       24                  
  25. Solstice on the Park                residential       268 ft        ... ..       25       ____     
  26. Montrose and Clarendon, Phase I     residential       260 ft        ... ..       26       ____     
  27. Montrose and Clarendon, Phase II    residential       ___ ft        ... ..       16       ____     
  28. GEMS Academy Phase 2                educational       240 ft        ... ..       13       ____     
  29. Cedar Hotel                         hotel             208 ft        ... ..       18       ____     
  30. 162 West Superior                   residential       189 ft        ... ..       17       ____     
  31. Nobu Hotel                          hotel             154 ft        ... ..       13       ____     
  32. Children's Mem. Hosp. Bldg.A1       residential       214 ft        ... ..       20       ____     
  33. Children's Mem. Hosp. Bldg.A2       residential       214 ft        ... ..       20       ____     
  34. One South Halsted                   residential       ___ ft        ... ..       49       ____     
  35. 171 West Van Buren                  residential       ___ ft        ... ..       40       ____     
  36. Wabash and Superior                 res./hotel        ___ ft        ... ..       36       ____     
  37. Polk and Financial                  residential       ___ ft        ... ..       33       ____     
  38. 353 West Grtand                     residential       ___ ft        ... ..       32       ____     
  39. LDVA Student Housing                residential       ___ ft        ... ..       32       ____     
  40. 725 West Randolph                   residential       ___ ft        ... ..       31       ____     
  41. LaSalle and Illinois                residential       ___ ft        ... ..       31       ____     
  42. Wacker Plaza                        office            ___ ft        ... ..       31       ____     
  43. Wells & Congress Pkwy               hotel             ___ ft        ... ..       27       ____     
  44. 237 East Ontario                    residential       262 ft        ... ..       26       ____     
  45. 460 West Chicago                    residential       ___ ft        ... ..       25       ____     
  46. 808 North Wells                     residential       ___ ft        ... ..       24       ____     
  47. Blanc Chicago (Wells and Ontario)   residential       ___ ft        ... ..       23       ____     
  48. 215 West Hubbard                    office/res.       ___ ft        ... ..       22       ____     
  49. Jefferson and Polk                  residential       ___ ft        ... ..       22       ____     
  50. 300 West Huron                      residential       ___ ft        ... ..       22       ____     
  51. Wells and Ontario (NW corner)       residential       ___ ft        ... ..       22       ____     
  52. 625 West Adams Street               office            ___ ft        ... ..       20       ____     
  53. 2109-2135 South Wabash complex      residential       ___ ft        ... ..       19       ____     
  54. 181 N. Clark hotel                  hotel             ___ ft        ... ..       19       ____     
  55. 645 West Madison                    office            ___ ft        ... ..       19       ____     
  56. 2775 North Hampden                  residential       ___ ft        ... ..       17       ____     
  57. 403 North Wabash                    residential       ___ ft        ... ..       17       ____     
  58. 900 West Randolph                    residential       ___ ft        ... ..       17       ____     
  59. Illinois Medical District Complex   hotel/res.        ___ ft        ... ..       16       ____     
  60. 30 East                              residential      ___ ft        ... ..       16       ____     
  61. JBC West Loop Mega Lot                              residential      ___ ft        ... ..       13-17       ____     
  62. Printer's Row Micro Apts            residential       ___ ft        ... ..       15       ____     
  63. Grand Imperial Hotel                hotel             ___ ft        ... ..       15       ____     
  64. Bluewater 5440                      residential       ___ ft        ... ..       14       ____     
  65. Bush Temple Tower addition          residential       ___ ft        ... ..       15       ____     
  66. 1411 South Michigan          residential       ___ ft        ... ..       14       ____     
  67. 111 South Peoria                    residential       ___ ft        ... ..       13       ____     
  68. Bridgeford Foods site                    residential       ___ ft        ... ..       13       ____     
  69. Fulton Market tower                 residential       149 ft        ... ..       12       ____     
  70. 768 North Aberdeen                  residential       ___ ft        ... ..       12       ____     
  71. Hoxton Hotel                  hotel       ___ ft        ... ..       12       ____     
  72. Harper Court Residential Tower      residential       ___ ft        ... ..       __       ____     
  73. Ibero-American Tower                office/hotel      ___ ft        ... ..       __       ____     
  74. Chicago Riverline                   multi-resi.       ___ ft        ... ..       __       ____     




- renderings for the under construction, site prep, and proposed projects:



Under Construction


451 East Grand - Active







150 North Riverside







River Point







Optima Chicago Center II







CNA Center







Wolf Point, West Tower







200 North Michigan







545 North McClurg







The Ability Institute of RIC







Marriott Marquis McCormick Place







The Sinclair (Tower of Jewel)







9th and State








167 West Erie







Block 37 Residential Tower







720 North LaSalle








833 North Clark







No. 9 Walton







215 W lake







Atrium Village Phase 1






4 East Elm







730 West Couch







1035 West Van Buren - Active







Next at 347 West Chestnut







640 North Wells







1333 South Wabash







750 North Hudson







London Guarantee Building Addition







108 North Jefferson








City Hyde Park







2950 North Sheridan








226-228 East Ontario








Niche 905 (905 North Orleans)








625 West Division







Webster Square







2293 North Milwaukee







University of Chicago Dormitory








Kenect (500 North Milwaukee)








400 West Huron








NU Biomedical Research Center







Vue53


















Site Prep/demo


590 West Madison








1001 West Chicago







State and Huron







Viceroy Hotel

















Proposed


Wanda Vista - Active







Wolf Point, South Tower (center) - Active







113 East Roosevelt - Active







1000 South Michigan - Active







130 North Franklin - Active







Wolf Point, East Tower (right) - Active







201 North Columbus - Active







Essex Inn addition - Active







465 North Park - Active








1300 South Michigan - Active







Atrium Village Phases 2, 3 and 4 - Active







330 North Clark - Active







1028 North Dearborn - Active







Weed and Fremont - Active








1061 W. Van Buren - Active







River South South - Active







Wells and Congress Parkway Hotel - Active







181 N. Clark hotel - Active







Printers Row tower - Active







3Eleven Illinois - Active







McHugh Hotel (Chinatown) - Active







808 North Wells - Active







300 West Huron - Active






Jefferson and Polk - Active






1136 South Wabash - Active







Solstice on the Park - Active







237 East Ontario - Active







Montrose and Clarendon, Phase I - Active







Montrose and Clarendon, Phase II (rendering on the right) - Active







GEMS Academy Phase 2 - Active







2109-2135 South Wabash complex - Active







162 West Superior - Dormant







403 North Wabash - Active







Fulton Market tower - Active







Nobu Hotel - Active (pending design change)







Hoxton Hotel - Active







Children's Memorial Hospital Buildings A1 and A2 - Active







One South Halsted - Active







171 West Van Buren - Dormant







Wabash and Superior - Active







Polk and Financial - Active







353 West Grand - Active







LDVA Student Housing - Dormant







725 West Randolph - Active







LaSalle and Illinois - Active







Wacker Plaza - Dormant







30 East - Active







JBC West Loop Mega Lot - Active







900 West Randolph Block - Active







460 West Chicago - Active







1411 South Michigan - Active







Printer's Row Micro Apts - Active







Bridgeford Foods development site - Active







Blanc Chicago (Wells and Ontario) - Active







215 West Hubbard - Active







625 West Adams - Active







645 West Madison - Active








Illinois Medical District Complex - Active







Bluewater 5440 - Dormant (possibly dead)







111 South Peoria - Active







Harper Court, Residential Tower - Dormant







Bush Temple Tower addition - Active







Ibero-American Tower - Active







768 North Aberdeen - Active






Riverline Development (multiple highrises) - Active






recently completed:
  1. Hilton Garden Inn              hotel             ___ ft        ... ..       27       ____     
  2. Hyatt Place Hotel              hotel             211 ft        ... ..       18       ____     
  3. Gateway Tower                  residential       173 ft        ... ..       17       ____     
  4. 1345 South Wabash              residential       ___ ft        ... ..       15       ____     



- Skyscraperpage thread links:

CHICAGO: One Museum Park

CHICAGO: OneEleven (111 West Wacker)

CHICAGO: 130 North Franklin

CHICAGO: 201 North Columbus

CHICAGO: 300 North Lasalle

CHICAGO: 375 East Wacker

CHICAGO: 435 North Park Drive

CHICAGO: 451 East Grand

CHICAGO: 500 North Lake Shore Drive

CHICAGO: Aqua

CHICAGO: BCBS vertical expansion

CHICAGO: 25 West Randolph / Block 37

CHICAGO: Chicago Spire

CHICAGO: Coast at Lakeshore East

CHICAGO: The Elysian

CHICAGO: Legacy at Millennium Park

CHICAGO: Lincoln Park 2550

CHICAGO: Marriott Marquis McCormick Place

CHICAGO: Optima Center Chicago

CHICAGO: Optima Center Chicago II

CHICAGO: Post Office Redevelopment

CHICAGO: Ritz-Carlton Residences

CHICAGO: River Point (444 West Lake)

CHICAGO: Roosevelt University Dorm

CHICAGO: Trump Tower

CHICAGO: Willis Tower Hotel Project

CHICAGO: Wolf Point






Chicago suburban building rundown:


     name                                              use           struct. ht.     roof ht.    floors     year


Under Construction:
  1. Oak Park - Lake and Forest tower          hotel/residential       ___ ft        ... ..      21       ____     


Proposed:*
  1. Evanston - 601 Davis                      residential            280 ft        ... ..       27       ____     
  2. Oak Park - Lake and North Blvd            residential            ___ ft        ... ..       20       ____     
  3. O'Hare Marriott-adjacent tower            residential            ___ ft        ... ..       18       ____     
  4. O'Hare Marriott-adjacent tower            office                 ___ ft        ... ..       14       ____     
  5. Evanston - 815 Ridge                      residential            ___ ft        ... ..       12       ____     
  6. Evanston - 1571 Maple                     residential            ___ ft        ... ..       12       ____     



- renderings for the under construction, site prep, and proposed projects:



Under Construction



Oak Park - Lake and Forest tower






Proposed



Evanston - 601 Davis - Active






Oak Park - Lake and North Blvd - Active







O'Hare Marriott-adjacent tower - Active







O'Hare Marriott-adjacent tower - Active







Evanston - 815 Ridge - Active







Evanston - 1571 Maple - Active

__________________
Don't be shy. Step into the light.

Last edited by Steely Dan; May 26, 2016 at 5:19 PM. Reason: New project proposals
Reply With Quote
     
     
  #2  
Old Posted Aug 9, 2015, 4:32 PM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 1,644
Nice! Thanks for taking on this huge project.
Reply With Quote
     
     
  #3  
Old Posted Aug 9, 2015, 4:47 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,466
Happy to do it. Apologies to Harry, JMT and marothisu, as your lasts posts in v6 were cut off. Please feel free to re-post here so as to pick up where we left off.
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #4  
Old Posted Aug 9, 2015, 8:30 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,808
Thanks for doing this. The thread needs a to make it easier to pick out.
Reply With Quote
     
     
  #5  
Old Posted Aug 9, 2015, 9:03 PM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Libertyville, IL
Posts: 12,096
Great work, Sentinel!
Reply With Quote
     
     
  #6  
Old Posted Aug 9, 2015, 9:17 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,808
Also 1333 S Wabash should be listed as U/C, the foundations are already in the ground and they are clearly excavating them and prepping to form the mat.

Also, has anyone driven by 750 N Hudson recently? They closed their loan a week or two ago so they should have shovels in the ground (unless of course they are in permit hell, but they usually don't close loans until the permit has been issued).
Reply With Quote
     
     
  #7  
Old Posted Aug 9, 2015, 10:05 PM
Chicago Shawn's Avatar
Chicago Shawn Chicago Shawn is offline
Registered User
 
Join Date: Jan 2003
Location: Chicago
Posts: 2,750
Great work, although a bit sad to see the impressive recently completed list stripped from page 1. First update: Marriott Marquis is definitely under construction
Reply With Quote
     
     
  #8  
Old Posted Aug 9, 2015, 11:51 PM
jc5680's Avatar
jc5680 jc5680 is online now
Registered User
 
Join Date: Oct 2007
Location: Chicago—West Loop
Posts: 765
Thanks for picking up the mantle, it is certainly a big project to take on, it is much appreciated

A couple things I noticed…

This guy is missing from the thread title, he is usually a part of all the Chicago threads

Hyatt Place in the loop is done, and has been operating for several weeks.

I believe gateway tower is all wrapped up now too.

I would be strongly in favor of keeping the recently completed projects list. It ads context to boom and as someone in the last version noted, it serves as a nice archive of what has been completed in recent years.
Reply With Quote
     
     
  #9  
Old Posted Aug 10, 2015, 12:10 AM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,466
So I moved the following to U/C:

- Marriott Marquis
- 1333 S Wabash

Edit: 'Recently Completed' list re-added towards end of rundown, with new additions only as they are completed, moving forward:

- Hyatt Place
- Gateway Tower, West Loop


Thanks for all of the information.
__________________
Don't be shy. Step into the light.

Last edited by sentinel; Aug 10, 2015 at 12:25 AM.
Reply With Quote
     
     
  #10  
Old Posted Aug 10, 2015, 12:54 AM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,808
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #11  
Old Posted Aug 10, 2015, 4:34 AM
Tom In Chicago's Avatar
Tom In Chicago Tom In Chicago is offline
Moderator
 
Join Date: Jul 2001
Location: Sick City
Posts: 6,001
Hilton Garden Inn is completed and open for business. . .

. . .
__________________
Tom in Chicago
. . .
Near the day of Purification, there will be cobwebs spun back and forth in the sky.
Reply With Quote
     
     
  #12  
Old Posted Aug 10, 2015, 2:44 PM
harryc's Avatar
harryc harryc is online now
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 6,873
Near New City - 8/4

The name of this one always escapes me.
__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #13  
Old Posted Aug 10, 2015, 2:49 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,466
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #14  
Old Posted Aug 10, 2015, 3:03 PM
harryc's Avatar
harryc harryc is online now
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 6,873
108 N Jefferson 7/28





__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #15  
Old Posted Aug 10, 2015, 3:11 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,808
Quote:
Originally Posted by sentinel View Post
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
From above re: 750 N Hudson:

Quote:
Originally Posted by LouisVanDerWright View Post
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #16  
Old Posted Aug 10, 2015, 3:16 PM
munchymunch's Avatar
munchymunch munchymunch is online now
MPLSXCHI
 
Join Date: Feb 2014
Location: Omicron Persei 8
Posts: 896
Can we include RUMORED projects like 1000 s state, and the SAIC tower? Also can you add River South.

Thanks for the new thread.
__________________
"I don't want to be interesting. I want to be good." -Ludwig Mies van der Rohe
Reply With Quote
     
     
  #17  
Old Posted Aug 10, 2015, 4:11 PM
Jibba's Avatar
Jibba Jibba is offline
Registered User
 
Join Date: Mar 2008
Location: Chicago
Posts: 2,359
Looks great sentinel.

FYI, rendering for 61 Erie is incorrect (the drawing for 162 W Superior is shown for its entry).
Reply With Quote
     
     
  #18  
Old Posted Aug 10, 2015, 5:03 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,808
I guess 905 N Orleans was approved by the city:



http://www.chicagoarchitecture.org/2...-goes-bye-bye/

I think that needs to be added to the proposals list.
Reply With Quote
     
     
  #19  
Old Posted Aug 10, 2015, 5:51 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,466
^^^I saw that, but are we sure this one is different from 915 N Orleans, for which we already have an entry? Or is it the same project with an address snafu and a slightly modified design? Hmmmmm...


Also, thanks for the note Jibba. Will update soon...
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #20  
Old Posted Aug 10, 2015, 6:05 PM
harryc's Avatar
harryc harryc is online now
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 6,873
200 N Mich - getting close to the top


7/21


7/22


8/04


8/07
__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 2:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2016, vBulletin Solutions, Inc.