Skyscraper posters - sale!  
HomeDiagramsCitiesForumSkyscraper PostersStore
     
--> Welcome to the SkyscraperPage Forum.

Since 1999, SkyscraperPage.com's forum has been one of the most active skyscraper enthusiast communities on the web. The global membership discusses development news and construction activity on projects from around the world, alongside discussions on urban design, architecture, transportation and many other topics. SkyscraperPage.com also features unique skyscraper diagrams, a database of construction activity, and publishes popular skyscraper posters.

You are currently browsing as a guest. Register with the SkyscraperPage Forum and join this growing community of skyscraper enthusiasts. Registering has benefits such as fewer ad banners, the ability to post messages, private messaging and more.

Go Back   SkyscraperPage Forum > Projects & Construction > Highrise Construction

Reply

 
Thread Tools Display Modes
     
     
  #1  
Old 03-28-2007, 11:55 PM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217
PITTSBURGH | Three PNC Plaza | HEIGHT | 23 FLOORS


November 2007 Update:

23 floors
360 feet / 110 meters
752,000 sq. ft.


Downtown Pittsburgh is witnessing the erection of its first tower over 20 stories since the 1988 completion of Dominion Tower. Three PNC Plaza is being built by PNC Bank, headquartered in Pittsburgh, and will be completed in Fall 2008. The location is at the intersection of Fifth Ave. and Liberty Ave. The 23-story 780,000 sq. ft. office/condo/hotel/retail/parking complex will attempt to meet LEED-certified "green" building standards established by the U.S. Green Building Council. The project is projected to cost $178M. Major tenents include PNC itself and Reed Smith (one of the world's largest law firms). The 326,000 sq. ft. of office space will be split in half amongst PNC and Reed Smith. Toronto-based Fairmount Hotels & Resorts will operate a 185-room on portions of the top 10 floors. 28 condos will also take portions of the top floors, seperated from the hotel by different elevator lobbies. A 6000 sq. ft. hotel ballroom will reside on the 2nd floor, overlooking Fifth Ave. The project will include 3 levels of underground parking. 2 hydraulic and 15 traction elevators will be installed by Marshall Elevators. Architects include San Francisco-based Gensler and Pittsburgh-based Astorino.

PNC Press Kit

View from Liberty Ave.


View from Fifth Ave.


Latest construction shot (Feb 27, 2008) by PA Pride



Last edited by Evergrey : 04-18-2008 at 03:01 AM.
Reply With Quote
     
     
  #2  
Old 03-29-2007, 12:28 AM
volguus zildrohar's Avatar
volguus zildrohar volguus zildrohar is offline
¡Suelta la Mujer!
 
Join Date: Apr 2002
Location: The City Of Philadelphia
Posts: 13,273

So that's why PNC suddenly upped its overdraft fees.


Reply With Quote
     
     
  #3  
Old 03-29-2007, 12:35 AM
Lecom's Avatar
Lecom Lecom is offline
Murderator
 
Join Date: Apr 2003
Location: Tokyo
Posts: 11,905

^That's also why they pulled that job with your account.

Nice clean design. Could've been taller, but nice Downtown infill anyway.


Reply With Quote
     
     
  #4  
Old 03-29-2007, 07:17 AM
bcp's Avatar
bcp bcp is online now
Urban Living
 
Join Date: Jul 2001
Posts: 3,963

holy crap...i love that building


Reply With Quote
     
     
  #5  
Old 03-29-2007, 09:24 PM
BANKofMANHATTAN's Avatar
BANKofMANHATTAN BANKofMANHATTAN is offline
Go Pens!
 
Join Date: Mar 2005
Location: Pittsburgh, PA
Posts: 416

Just some ideas i was messing around with today, seeing what 3PNC would have looked like taller, with a slightly different design etc.

thanks to nice renderings my job was made easier...

enjoy!







Reply With Quote
     
     
  #6  
Old 05-01-2007, 08:46 PM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217

from their Fact Sheet

http://www.pnc.com/webapp/unsec/Requ..._FactSheet.pdf

Growing Green
Three PNC Plaza builds on the company’s award-winning commitment to environmental responsibility and green construction.

• PNC has designed and constructed more buildings (38 as of February 2007) based on U.S. Green Building Council standards than any other U.S. company.
• PNC Firstside Center in downtown Pittsburgh is the second largest corporate green building (650,000 square feet) in the nation.
• PNC is the only major U.S. bank to design and construct green branches (36 open in five states that are LEED certified or in the process of being certified and 11 more branches that are under construction as of February 2007).
• Three PNC Plaza is projected to be one of the nation’s largest green, mixed-use buildings.
• To make way for the new building, existing structures were deconstructed instead of demolished and the various components were earmarked for recycling.
o Concrete was crushed into gravel for use in other construction.
o Iron and steel to be recycled.
o Plumbing and other reusable fixtures, such as tin ceiling plates and glass
doorknobs, will be donated to Construction Junction, a non-profit agency.

Sustainability

A central focus of the sustainability strategy for Three PNC Plaza lies in the Triple BottomLine approach, a comprehensive view of how the project at economic, environmental, and community levels. The underlying concept behind this methodology is to define a balance in each of the three categories in order to maintain true sustainability in the built environment. PNC’s efforts to redevelop this part of downtown Pittsburgh with a mixed-use development aligns well with the Triple Bottom Line approach and addresses all three of the major categories. With respect to economics, Three PNC Plaza stimulates growth in the downtown retail and business core; with regard to the environment, the project encourages a denser urban center that creates less sprawl and utilizes existing infrastructure; and on the social level, it helps maintain viability of the downtown community by encouraging more activity. By using this methodology and following the USGBC’s LEED guidelines, the project team is creating a building that is healthy for both occupants and the environment. Under the criteria of this program, Three PNC Plaza’s green design elements will include:

􀂃 The use of high performance glazing systems, natural light and high efficiency heating and air conditioning systems that enable the project to exceed national energy efficiency standards by 10-15 percent.
􀂃 A minimum use of 50 percent of construction materials such as structural steel, carpet and ceilings from recycled materials.
􀂃 Use of refrigerants that minimize or eliminate the emissions of compounds that contribute to ozone depletion and global warming.
􀂃 Recycling and salvaging construction waste such as wood, steel and cardboard to reduce landfill shipments and space required.
􀂃 Reduced water use for landscaping (50 percent) and general building use (20 percent).
􀂃 Using low emitting materials for all interior spaces to reduce contaminants and improve air quality for occupants.
􀂃 Use of green cleaning materials for all maintenance work in order to eliminate
harmful chemicals inside the building.
􀂃 Providing an educational program for employees and visitors that explains green building features.
􀂃 Providing green design guidelines for all future tenants which will be used in
developing their respective spaces to high performance green standards.
􀂃 Operating the hotel consistent with Fairmont’s Green Partnership Program
􀂃 Operating the office building consistent with PNC’s Green Practices


...


PNC has built 36 "green" bank branches... and in 2001 completed the 650k sq. ft. PNC Firstside located in Downtown Pittsburgh.



Reply With Quote
     
     
  #7  
Old 06-12-2007, 02:30 PM
RadHaz75's Avatar
RadHaz75 RadHaz75 is offline
George is gettin' upset!
 
Join Date: Sep 2005
Location: Philadelphia, PA
Posts: 283

So its been a month and a half since anyone's posted anything. How's this puppy coming along? I haven't been able to make it home for a while and won't until August.

Pics anyone? Is there anything other than a hole yet?


Reply With Quote
     
     
  #8  
Old 06-17-2007, 05:50 PM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217

ask and you shall receive...

I took this photo yesterday... sorry for it's crappiness as I snapped it quickly because I didn't want to deal with any potential "Hey! You can't take pictures here!" scenarios from the construction workers...

Anyways... one of the workers told me the building is to be 28 stories with a structural height of 380 feet. He said it will be as tall as One PNC Plaza (which is actually 424 ft. and 34 stories). I didn't ask to specify whether any of those 28 stories or any amount of the structural height he mentioned were underground... I thought I read that the tower will include 2 levels of underground parking. So either the worker had his numbers wrong... or PNC has tweaked the tower a bit. PNC has long stated the tower will be 23 stories... though there was never any number on structural height... which I assumed would be in the low 300s.




Last edited by Evergrey : 06-17-2007 at 06:02 PM.
Reply With Quote
     
     
  #9  
Old 06-24-2007, 07:43 PM
RadHaz75's Avatar
RadHaz75 RadHaz75 is offline
George is gettin' upset!
 
Join Date: Sep 2005
Location: Philadelphia, PA
Posts: 283

thanks evergrey! so it looks like they are just starting to begin the building itself. any word on what it will be be (concrete/steel/both)? its hard to tell if those are forums for a concrete center down there, but i might imagine it might be too small to be a composite like comcast center in philly.


Reply With Quote
     
     
  #10  
Old 09-17-2007, 05:13 PM
RadHaz75's Avatar
RadHaz75 RadHaz75 is offline
George is gettin' upset!
 
Join Date: Sep 2005
Location: Philadelphia, PA
Posts: 283

hey guys been a few months since an update, is it above ground yet? pics anyone?


Reply With Quote
     
     
  #11  
Old 09-17-2007, 05:32 PM
giovanni sasso's Avatar
giovanni sasso giovanni sasso is offline
suckas need bodyguards
 
Join Date: Mar 2002
Location: fishtown, USA
Posts: 11,616

this is from june:


these are from august:




Reply With Quote
     
     
  #12  
Old 09-17-2007, 06:00 PM
Arriviste's Avatar
Arriviste Arriviste is offline
What we play is life.
 
Join Date: Nov 2004
Location: Calgary, Canada
Posts: 1,550

I really like this tower. Congratulations.


Reply With Quote
     
     
  #13  
Old 09-17-2007, 08:56 PM
RadHaz75's Avatar
RadHaz75 RadHaz75 is offline
George is gettin' upset!
 
Join Date: Sep 2005
Location: Philadelphia, PA
Posts: 283

hahaha thanks sasso. i love how the guy with the most recent pics is from 300 miles away.


Reply With Quote
     
     
  #14  
Old 09-18-2007, 02:47 AM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217

PA Pride took this photo yesterday



Reply With Quote
     
     
  #15  
Old 09-18-2007, 03:48 PM
RadHaz75's Avatar
RadHaz75 RadHaz75 is offline
George is gettin' upset!
 
Join Date: Sep 2005
Location: Philadelphia, PA
Posts: 283

thanks for the updates fellas. i'm so excited pittsburgh is getting a new tower and makes me hopeful it will spur growth of new ones.

I wish i still lived there so it would be easier to keep track of.


Reply With Quote
     
     
  #16  
Old 09-18-2007, 04:16 PM
Stephenapolis's Avatar
Stephenapolis Stephenapolis is offline
The True Avatar
 
Join Date: Jul 2001
Location: Minneapolis
Posts: 8,713

It is a very nice design. Too bad it isn't taller.


Reply With Quote
     
     
  #17  
Old 09-20-2007, 03:48 PM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217

http://www.fairmont.com

Fairmont Pittsburgh


Summer 2009

Fairmont Pittsburgh will be housed in Three PNC Plaza, a 780,000 square foot mixed-use "green" building complex in the heart of Pittsburgh’s Cultural District. The hotel will feature 185 guest rooms, approximately 12,000 square feet of meeting space including a 6,000 square foot divisible ballroom, a lobby lounge and bar, an 8,000 square foot spa and fitness center and a three-meal restaurant. The project will also include The Residences at The Fairmont, 28 luxurious condominiums located on the upper floors with separate elevator access.

http://en.wikipedia.org/wiki/Fairmon...can_properties


Reply With Quote
     
     
  #18  
Old 09-30-2007, 05:45 PM
Evergrey's Avatar
Evergrey Evergrey is online now
Closer to the Heart
 
Join Date: Apr 2003
Location: Banished to the land of wind and ghosts
Posts: 20,217





Reply With Quote
     
     
  #19  
Old 09-30-2007, 09:30 PM
colemonkee's Avatar
colemonkee colemonkee is offline
Ridin' into the sunset
 
Join Date: Nov 2004
Location: L.A. - Skid row adjacent
Posts: 4,061

That's an interesting core structure. Looks like it has six or seven separate cores. But they seem to be moving quickly.


Reply With Quote
     
     
  #20  
Old 09-30-2007, 11:38 PM
Johnland Johnland is offline
Registered User
 
Join Date: May 2007
Location: Tampa, FL
Posts: 427

Quote:
Originally Posted by Evergrey View Post


I can see an awful old parking gagrage across the street on Liberty Ave (next to the 70's looking crazy quilt facade of a really slender addition to an older building). Boy, if ever there was a candidate for a demolition job, it's that garage. Maybe with the new PNC 3 building bringing up the neighborhood, someone will do it.


Reply With Quote
     
     
Reply

Go Back   SkyscraperPage Forum > Projects & Construction > Highrise Construction
Forum Jump




Thread Tools
Display Modes



All times are GMT. The time now is 06:53 PM.

     

Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Forums Directory