HomeDiagramsDatabaseMapsForumSkyscraper Posters
     
Welcome to the SkyscraperPage Forum.

Since 1999, SkyscraperPage.com's forum has been one of the most active skyscraper enthusiast communities on the web.  The global membership discusses development news and construction activity on projects from around the world, alongside discussions on urban design, architecture, transportation and many other topics.  SkyscraperPage.com also features unique skyscraper diagrams, a database of construction activity, and publishes popular skyscraper posters.

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction

    

432 Park Avenue in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • New York Skyscraper Diagram
New York Projects & Construction Forum
            
View Full Map

Reply

 
Thread Tools Display Modes
     
     
  #2001  
Old Posted: Aug 2, 2012, 11:25 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 24,950
Quote:
Originally Posted by marcatio View Post
As for when the floor slabs finally reach street level, perhaps October (late October) might be guess. Once the base floors are done, and the typical floors (floor plates whose dimensions are typically the same) are reached (the tower itself), the structure will rise fast


With the Freedom Tower topping out, all eyes will turn here as the newest of supertalls in the City climbs upward.

Another look from the cam...






__________________
Love NEW YORK?

Visit New York's icon. See the City of shores. Walk the Streets of Manhattan.
The evolving skyline, NY Skyscrapers & Construction
Reply With Quote
     
     
  #2002  
Old Posted: Aug 3, 2012, 1:09 PM
hunser hunser is offline
Wiener Blut
 
Join Date: Feb 2009
Location: 10026 NY / 1040 Wien
Posts: 2,126
Impressive speed. Once above street level, this will go up in no time. We are lucky to watch yet another supertall rise on the ever changing New York skyline.
Reply With Quote
     
     
  #2003  
Old Posted: Aug 3, 2012, 1:11 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
Today's activities:

It appears that concrete might be poured for the wall that was formed on the west side. I say this, as the 56th Street barricades have been re-arranged, suggesting that a concrete delivery may occur. In addition, a work platform has been added to the top of the wall section parallel to 56th Street. If this wall is not poured today, there is a possibility that the southeast (56th Street/Park Av) corner tower footing may be poured. Column reinforcement has just been placed in that corner tower footing form. Drilling continues on the south footing pads, and workers are adding reinforcement to the other two east (Park Av) footing forms.
Reply With Quote
     
     
  #2004  
Old Posted: Aug 3, 2012, 2:03 PM
NewYorkDominates's Avatar
NewYorkDominates NewYorkDominates is offline
Registered User
 
Join Date: Jan 2012
Posts: 864
^This is why love this forum,we have experts to explain to us newbies what is actually going on at the site.

Thanks Marcatio,
__________________
"I went too a restaurant that served breakfast at anytime, so i ordered french toast during the renaissance."-Who else?
Reply With Quote
     
     
  #2005  
Old Posted: Aug 3, 2012, 2:10 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
You are welcome.

Concrete is now being poured for the west wall.
Reply With Quote
     
     
  #2006  
Old Posted: Aug 3, 2012, 2:40 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
Update:
As the west wall is being poured, it appears that the southeast corner tower footing may be ready to receive concrete. The middle footing is getting ready to receive column reinforcement, and the drill is now working on the next pad.
Reply With Quote
     
     
  #2007  
Old Posted: Aug 3, 2012, 2:48 PM
Don098 Don098 is offline
BANNED
 
Join Date: Nov 2007
Location: Rosslyn, VA
Posts: 1,157
Do you think we'll get an official render anytime soon? I've never seen construction begin without renders being released to the public...
Reply With Quote
     
     
  #2008  
Old Posted: Aug 3, 2012, 2:52 PM
tubeworm tubeworm is offline
Registered User
 
Join Date: May 2012
Location: Danbury, CT (Greater NYC)
Posts: 49
From the Park Avenue cam, it looks like they are packing stuff up that they no longer need on a flat bed. They are probably making room for more materials and maybe a crane!?!?
Reply With Quote
     
     
  #2009  
Old Posted: Aug 3, 2012, 3:45 PM
ThatOneGuy's Avatar
ThatOneGuy ThatOneGuy is offline
User that is Registered
 
Join Date: May 2012
Location: Constanta
Posts: 621
^^ The render with the thin rectangular design is the one being built, without a doubt.
Reply With Quote
     
     
  #2010  
Old Posted: Aug 3, 2012, 4:04 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
At the rate things are going, it seems that perhaps all three east side tower footings might be poured today. Currently, the west wall concreting continues. Column reinforcement installed in the two tower footing forms adjacent to the southeast corner tower footing, and it appears that the middle footing is ready for concrete, with workers working on the last of the east tower footing reinforcing.
Reply With Quote
     
     
  #2011  
Old Posted: Aug 3, 2012, 4:51 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
Hydraulic excavators are such versatile machines. Currently, the southeast corner tower footing is receiving concrete via the excavator, using its turned-around bucket like a ladle, transferring concrete from the mixers up on the street to the footing form.

Seeing these excavators, and comparing the methods of construction back in the day when cable machines were the rule, one can see the greater efficiency. I recall back then, for a similar job like this, you would require a crane in the pit for placing concrete and moving materials, digging done by power shovel, or cable pullshovels (backhoes), perhaps a small backhoe/loader for digging smaller holes, etc. Now, with quick couplers on the hydraulic excavator, it's just a matter of dropping an attacment, and picking up another in a matter of seconds for the task at hand. Back then, when hydraulic hammers were not available, there was quite a bit more blasting required. On this job, the excavators were used as: cranes for lifting, concrete wheelbarrow, rock breakers as well as excavating.

The three large excavators are Hitachi Xaxis 800 (the triple boom machine used as a crane) and the other two are Xaxis 850 machines. Also on site is a Hitachi short-swing excavator (the smaller one seen in the corner beside the air compressor), plus a mini-excavator.
Reply With Quote
     
     
  #2012  
Old Posted: Aug 3, 2012, 6:54 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
All three east tower footings have been poured. Drilling continues on the south tower footing pads. When the remaining five south footing pads have had the tendons installed, formed, and footing and column reinforcement installed, the tower footings for the future tower will be completed.
Reply With Quote
     
     
  #2013  
Old Posted: Aug 3, 2012, 7:28 PM
babybackribs2314 babybackribs2314 is offline
Registered User
 
Join Date: Apr 2006
Location: UWS, Manhattan
Posts: 1,432
Quote:
Originally Posted by Don098 View Post
Do you think we'll get an official render anytime soon? I've never seen construction begin without renders being released to the public...
You may have missed these ones?

432 Park Renderings

& Marcatio: thanks so much for the awesome updates! It's great to have someone with 'insider' knowledge on the process, makes the anticipation that much more interesting.
Reply With Quote
     
     
  #2014  
Old Posted: Aug 3, 2012, 7:35 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
Last report for the day.

The drill crew puts in a little O/T. The rest of the crew normally knocks off at 3:30PM (EST). the drill crew are continuing to drill, working on the third pad. If they work over the weekend drilling the remaining pads, it is conceivable that tendon installation can begin on Monday.
Reply With Quote
     
     
  #2015  
Old Posted: Aug 3, 2012, 7:40 PM
marcatio's Avatar
marcatio marcatio is offline
Registered User
 
Join Date: Jul 2012
Posts: 98
As I have said before, watching the progress via the webcam has been especially fun. What little I know about the process, I am happy to share.
Reply With Quote
     
     
  #2016  
Old Posted: Aug 4, 2012, 12:16 AM
manchester united manchester united is offline
Registered User
 
Join Date: Jan 2005
Posts: 161
Quote:
Originally Posted by hunser View Post
Impressive speed. Once above street level, this will go up in no time. We are lucky to watch yet another supertall rise on the ever changing New York skyline.
In your opinion, when will be top out this fantastic tower ?
Reply With Quote
     
     
  #2017  
Old Posted: Aug 4, 2012, 2:59 AM
TechTalkGuy's Avatar
TechTalkGuy TechTalkGuy is offline
@TechTalkGuy (Twitter)
 
Join Date: Jul 2006
Posts: 1,103
According to the official site, this project will consist of 3 buildings, where the retail component will be more iconic than the Apple cube !!

Imagine another Apple store !!
I hope it won't be a Microsoft or Google store.

Perhaps a second Nintendo World?
Maybe a super Sony Style store?

This question will keep me on the edge of my seat.
Reply With Quote
     
     
  #2018  
Old Posted: Aug 4, 2012, 3:04 AM
ThatOneGuy's Avatar
ThatOneGuy ThatOneGuy is offline
User that is Registered
 
Join Date: May 2012
Location: Constanta
Posts: 621
^^ Uh... does Microsoft even have stores?
I still find apple-esque glass boxes ugly. Hope it will look better than the generic ones you find around.
Reply With Quote
     
     
  #2019  
Old Posted: Aug 4, 2012, 4:37 AM
NYC GUY's Avatar
NYC GUY NYC GUY is offline
Registered User
 
Join Date: Nov 2011
Posts: 409
Microsoft does have stores.
Reply With Quote
     
     
  #2020  
Old Posted: Aug 4, 2012, 8:56 AM
babybackribs2314 babybackribs2314 is offline
Registered User
 
Join Date: Apr 2006
Location: UWS, Manhattan
Posts: 1,432
Microsoft's NYC flagship is going to be in 250 West 55th.

Apple already has a flagship, its cube.

I doubt Google will open a store, but it would make quite the splash if they did it here... I'd hedge on a luxury brand that has low penetration in the NAmerican market.
Reply With Quote
     
     
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:52 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.