HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations

Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Aug 9, 2015, 4:29 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,495
Cool CHICAGO | Highrise Projects & Construction, v7

Welcome to v7 of the Chicago Highrise Boom thread. - Here’s a link to the previous version of this page: CHICAGO: boom rundown - everything over 12 floors. v6

After a prolonged dip in development and construction during the leanest years of the Global Recession, the construction boom is back in full effect - while clearly not (yet) as prolific as the early 2000s, highrise activity has picked up considerably since 2013. Click on the individual building names to be taken to the corresponding Phorio building page to learn more and see pics/renderings. You can also click on the word “website” at the end of each building entry line in the list to be taken to the official project website to learn even more and for developer/marketing contact information. The buildings are ranked according to the structural height per the guidelines of Phorio. Where no roof height is listed, it is either unknown or the structural height and the roof height are one and the same.

A couple of quick notes on version 7:

- The 'Recently Completed' list will primarily reflect the new construction boom - the previous list is still accessible in version 6 of this rundown.

- Individual skyscraper thread links have been moved to the bottom of the rundown and will be updated to reflect current construction projects, plus new and forthcoming proposals.

- the 'Proposed' section of renderings has a status next to each project, whether they are 'Active' or 'Dormant' proposals. Any dormant proposals that are cancelled will be removed from the Boom rundown.

Please feel free send a private message or directed post in the thread for any updates or modifications to the page 1 list. A concerted effort will be made to make sure page 1 is always up to date. Many thanks to all of the contributors, custodians and photographers of this thread among others, for all of your painstaking work in showcasing Chicago's beautiful skyline.


Chicago's building boom:


color code:
red = over 1,000 ft
magenta = 700 - 999 ft
purple = 600 - 699 ft
blue = 500 - 599 ft
green = 400 - 499 ft
brown = 300 - 399 ft
Black = under 300 ft or unknown


     name                                   use            height     floors     year


Under Construction:
  1. 451 E. Grand                        res./hotel        850 ft       68       ____
  2. 150 N. Riverside - TO               office            752 ft       53       2016
  3. River Point - TO                    office            730 ft       52       ____
  4. Optima Chicago Center II            residential       587 ft       53       ____
  5. CNA Center                          office            568 ft       36       ____
  6. 465 N. Park                         residential       535 ft       45       ____
  7. 545 N. McClurg - TO                 residential       486 ft       45       ____
  8. The Ability Institute of RIC - TO   hospital          480 ft       27       2017
  9. Marriott Marquis McCormick Place    hotel             444 ft       40       ____
  10. The Sinclair                        residential       443 ft       35       2017
  11. 9th and State - TO                  residential       ___ ft       41       ____
  12. 167 W. Erie                         residential       408 ft       39       ____
  13. Marquee at Block 37 - TO            residential       400 ft       38       ____
  14. 720 N. LaSalle -  TO                residential       382 ft       35       ____
  15. 833 N. Clark                        residential       380 ft       34       ____
  16. No. 9 Walton                        residential       ___ ft       35       ____
  17. 215 W. Lake                         residential       348 ft       33       ____
  18. Atrium Village Phase 1              residential       341 ft       32       ____
  19. 4 E. Elm - TO                       residential       335 ft       25       2016
  20. 801 S. Financial                    residential       ___ ft       33       ____
  21. 1035 W. Van Buren                   residential       ___ ft       30       ____
  22. State and Huron                     residential       ___ ft       30       ____
  23. Next at 347 W. Chestnut - TO        residential       299 ft       28       2017
  24. 640 N. Wells                        residential       280 ft       22       ____
  25. 1333 S. Wabash                      residential       ___ ft       28       2015
  26. 108 N. Jefferson                    hotel             250 ft       23       ____
  27. 750 N. Hudson                       residential       240 ft       25       ____
  28. 3Eleven Illinois                    residential       ___ ft       24       ____
  29. 2950 N. Sheridan                    residential       215 ft       19       ____
  30. Viceroy Hotel                       hotel             ___ ft       18       ____
  31. 226-228 E. Ontario                  hotel             218 ft       17       ____
  32. Niche 905 (905 N. Wells)            residential       185 ft       17       ____
  33. 625 W. Adams                        office            ___ ft       18       ____
  34. 30 East                             residential       ___ ft       16       ____
  35. Webster Square                      residential       152 ft       12       ____
  36. 2293 N. Milwaukee - TO              residential       ___ ft       15       ____
  37. Bush Temple Tower addition          residential       ___ ft       15       ____
  38. University of Chicago Dorm - TO     residential       ___ ft       15       ____
  39. Kenect (500 N. Milwaukee) - TO      residential       ___ ft       15       ____
  40. 400 W. Huron                        residential       ___ ft       15       ____
  41. NU Biomedical Research Ctr.         hospital          ___ ft       15       2019
  42. 165 N. Des Plaines                  residential       ___ ft       14       ____
  43. Vue53 - TO                          residential       ___ ft       13       ____

“TO” indicates that the building has been topped out





Site Prep/Demo:
  1. 130 N. Franklin                     office            700 ft       50       ____
  2. 215 W. Hubbard                      office/res.       ___ ft       22       ____
  3. 1001 W. Chicago                     residential       205 ft       __       ____
  4. 1411 S. Michigan                    residential       ___ ft       14       ____




Proposed:*
  1. Wanda Vista                         res./hotel       1186 ft       98       2019
  2. Wolf Point, South Tower             office          ~1100 ft       __       2018
  3. 113 E. Roosevelt                    residential       887 ft       70       ____
  4. 1000 S. Michigan                    residential       832 ft       73       ____
  5. Wolf Point, East Tower              office            750 ft       60       2020
  6. 201 North Columbus                  res./hotel        642 ft       __       ____
  7. 590 W. Madison                      office/hotel      582 ft       44       ____
  8. Essex Inn addition                  hotel             575 ft       55       ____
  9. 1300 S. Michigan                    residential       490 ft       48       ____
  10. Atrium Village Phase 4              residential       420 ft       44       ____
  11. Atrium Village Phase 3              residential       410 ft       41       ____
  12. Atrium Village Phase 2              residential       380 ft       36       ____
  13. 330 North Clark                     residential       377 ft       __       ____
  14. 1028 North Dearborn                 residential       365 ft       29       ____
  15. Weed and Fremont                    residential       339 ft       31       ____
  16. 1061 West Van Buren                 residential       330 ft       32       ____
  17. McHugh Hotel (Chinatown)            residential       320 ft       27       ____
  18. 1136 South Wabash                   residential       304 ft       29       ____
  19. Chicago and Cambridge               residential       300 ft       __       ____
  20. State & Lake                        residential       ___ ft       31       ____
  21. River South South                   residential       ___ ft       29 & 19  ____
  22. Printers Row tower                  residential       ___ ft       24       ____
  23. Solstice on the Park                residential       268 ft       25       ____
  24. Montrose and Clarendon, Phase I     residential       260 ft       26       ____
  25. Montrose and Clarendon, Phase II    residential       ___ ft       16       ____
  26. GEMS Academy Phase 2                educational       240 ft       13       ____
  27. Cedar Hotel                         hotel             208 ft       18       ____
  28. 162 West Superior                   residential       189 ft       17       ____
  29. Nobu Hotel                          hotel             154 ft       13       ____
  30. Children's Mem. Hosp. Bldg.A1       residential       214 ft       20       ____
  31. Children's Mem. Hosp. Bldg.A2       residential       214 ft       20       ____
  32. One South Halsted                   residential       ___ ft       49       ____
  33. 171 West Van Buren                  residential       ___ ft       40       ____
  34. Wabash and Superior                 res./hotel        ___ ft       36       ____
  35. 353 West Grtand                     residential       ___ ft       32       ____
  36. LDVA Student Housing                residential       ___ ft       32       ____
  37. 725 West Randolph                   residential       ___ ft       31       ____
  38. LaSalle and Illinois                residential       ___ ft       31       ____
  39. Wacker Plaza                        office            ___ ft       31       ____
  40. Wells & Congress Pkwy               hotel             ___ ft       27       ____
  41. 217 North Jefferson                 residential       262 ft       27       ____
  42. 237 East Ontario                    residential       262 ft       26       ____
  43. 460 West Chicago                    residential       ___ ft       25       ____
  44. 808 North Wells                     residential       ___ ft       24       ____
  45. Blanc Chicago (Wells and Ontario)   residential       ___ ft       23       ____
  46. Jefferson and Polk                  residential       ___ ft       22       ____
  47. 300 West Huron                      residential       ___ ft       22       ____
  48. Wells and Ontario (NW corner)       residential       ___ ft       22       ____
  49. 2109-2135 South Wabash complex      residential       ___ ft       19       ____
  50. 181 N. Clark hotel                  hotel             ___ ft       19       ____
  51. 645 West Madison                    office            ___ ft       19       ____
  52. 2775 North Hampden                  residential       ___ ft       17       ____
  53. 403 North Wabash                    residential       ___ ft       17       ____
  54. Andaz Hotel                         hotel             ___ ft       18       ____
  55. 900 West Randolph                   residential       ___ ft       17       ____
  56. Illinois Medical District Complex   hotel/res.        ___ ft       16       ____
  57. JBC West Loop Mega Lot              residential       ___ ft       13-17    ____
  58. Printer's Row Micro Apts            residential       ___ ft       15       ____
  59. Grand Imperial Hotel                hotel             ___ ft       15       ____
  60. Bluewater 5440                      residential       ___ ft       14       ____
  61. 111 South Peoria                    residential       ___ ft       13       ____
  62. Bridgeford Foods site               residential       ___ ft       13       ____
  63. Fulton Market tower                 residential       149 ft       12       ____
  64. 768 North Aberdeen                  residential       ___ ft       12       ____
  65. Hoxton Hotel                        hotel             ___ ft       12       ____
  66. Harper Court Residential Tower      residential       ___ ft       __       ____
  67. Ibero-American Tower                office/hotel      ___ ft       __       ____
  68. Chicago Riverline                   multi-resi.       ___ ft       __       ____







Under Construction


451 East Grand







150 North Riverside







River Point







Optima Chicago Center II







CNA Center







465 North Park







545 North McClurg







The Ability Institute of RIC







Marriott Marquis McCormick Place







The Sinclair (Tower of Jewel)







9th and State








167 West Erie







Block 37 Residential Tower







720 North LaSalle








833 North Clark







No. 9 Walton







215 W Lake







Atrium Village Phase 1







801 S Financial







4 East Elm







1035 West Van Buren







State and Huron






Next at 347 West Chestnut







640 North Wells







1333 South Wabash








108 North Jefferson







750 North Hudson







3Eleven Illinois







2950 North Sheridan








226-228 East Ontario








Niche 905 (905 North Orleans)








Viceroy Hotel







625 West Adams








30 East







Webster Square







2293 North Milwaukee







Bush Temple Tower addition







University of Chicago Dormitory








Kenect (500 North Milwaukee)








400 West Huron








NU Biomedical Research Center







165 N Des Plaines







Vue53


















Site Prep/demo


130 North Franklin







215 West Hubbard







1001 West Chicago







1411 South Michigan













Proposed


Wanda Vista - Active







Wolf Point, South Tower (center) - Active







113 East Roosevelt - Active







1000 South Michigan - Active







Wolf Point, East Tower (right) - Active







201 North Columbus - Active







590 West Madison







Essex Inn addition - Active








1300 South Michigan - Active







Atrium Village Phases 2, 3 and 4 - Active







330 North Clark - Active







1028 North Dearborn - Active







Weed and Fremont - Active








1061 W. Van Buren - Active







River South South - Active







Wells and Congress Parkway Hotel - Active







217 N. Jefferson - Active







181 N. Clark hotel - Active







Printers Row tower - Active







McHugh Hotel (Chinatown) - Active







808 North Wells - Active







300 West Huron - Active






Jefferson and Polk - Active






1136 South Wabash - Active







Solstice on the Park - Active







237 East Ontario - Active







Montrose and Clarendon, Phase I - Active







Montrose and Clarendon, Phase II (rendering on the right) - Active







Andaz Hotel - Active







GEMS Academy Phase 2 - Active







2109-2135 South Wabash complex - Active







162 West Superior - Dormant







403 North Wabash - Active







Fulton Market tower - Active







Nobu Hotel - Active







Hoxton Hotel - Active







Children's Memorial Hospital Buildings A1 and A2 - Active







One South Halsted - Active







171 West Van Buren - Dormant







Wabash and Superior - Active










353 West Grand - Active







LDVA Student Housing - Dormant







725 West Randolph - Active







LaSalle and Illinois - Active







Wacker Plaza - Dormant








JBC West Loop Mega Lot - Active







900 West Randolph Block - Active







460 West Chicago - Active







Printer's Row Micro Apts - Active







Bridgeford Foods development site - Active







Blanc Chicago (Wells and Ontario) - Active







645 West Madison - Active








Illinois Medical District Complex - Active







Bluewater 5440 - Dormant (possibly dead)







111 South Peoria - Active







Harper Court, Residential Tower - Dormant







Ibero-American Tower - Active







768 North Aberdeen - Active






Riverline Development (multiple highrises) - Active




















Chicago suburban building rundown:


     name                                              use           struct. ht.     roof ht.    floors     year


Under Construction:
  1. Oak Park - Lake and Forest tower - TO     hotel/residential       ___ ft        ... ..      21       ____     
  2. Oak Park - Lake and North Blvd            residential            ___ ft        ... ..       20       ____     
  3. Evanston - 1571 Maple                     residential            ___ ft        ... ..       12       ____     


Proposed:*
  1. Evanston - 601 Davis                      residential            280 ft        ... ..       27       ____     
  2. O'Hare Marriott-adjacent tower            residential            ___ ft        ... ..       18       ____     
  3. O'Hare Marriott-adjacent tower            office                 ___ ft        ... ..       14       ____     



- renderings for the under construction, site prep, and proposed projects:



Under Construction



Oak Park - Lake and Forest tower







Oak Park - Lake and North Blvd - Active







Evanston - 1571 Maple - Active





Proposed



Evanston - 601 Davis - Active







O'Hare Marriott-adjacent tower - Active







O'Hare Marriott-adjacent tower - Active

__________________
Don't be shy. Step into the light.

Last edited by i_am_hydrogen; Jul 22, 2016 at 2:59 PM. Reason: Project status updates
Reply With Quote
     
     
  #2  
Old Posted Aug 9, 2015, 4:32 PM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 1,753
Nice! Thanks for taking on this huge project.
Reply With Quote
     
     
  #3  
Old Posted Aug 9, 2015, 4:47 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,495
Happy to do it. Apologies to Harry, JMT and marothisu, as your lasts posts in v6 were cut off. Please feel free to re-post here so as to pick up where we left off.
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #4  
Old Posted Aug 9, 2015, 8:30 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,957
Thanks for doing this. The thread needs a to make it easier to pick out.
Reply With Quote
     
     
  #5  
Old Posted Aug 9, 2015, 9:03 PM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Libertyville, IL
Posts: 12,280
Great work, Sentinel!
Reply With Quote
     
     
  #6  
Old Posted Aug 9, 2015, 9:17 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,957
Also 1333 S Wabash should be listed as U/C, the foundations are already in the ground and they are clearly excavating them and prepping to form the mat.

Also, has anyone driven by 750 N Hudson recently? They closed their loan a week or two ago so they should have shovels in the ground (unless of course they are in permit hell, but they usually don't close loans until the permit has been issued).
Reply With Quote
     
     
  #7  
Old Posted Aug 9, 2015, 10:05 PM
Chicago Shawn's Avatar
Chicago Shawn Chicago Shawn is offline
Registered User
 
Join Date: Jan 2003
Location: Chicago
Posts: 2,751
Great work, although a bit sad to see the impressive recently completed list stripped from page 1. First update: Marriott Marquis is definitely under construction
Reply With Quote
     
     
  #8  
Old Posted Aug 9, 2015, 11:51 PM
jc5680's Avatar
jc5680 jc5680 is offline
Registered User
 
Join Date: Oct 2007
Location: Chicago—West Loop
Posts: 772
Thanks for picking up the mantle, it is certainly a big project to take on, it is much appreciated

A couple things I noticed…

This guy is missing from the thread title, he is usually a part of all the Chicago threads

Hyatt Place in the loop is done, and has been operating for several weeks.

I believe gateway tower is all wrapped up now too.

I would be strongly in favor of keeping the recently completed projects list. It ads context to boom and as someone in the last version noted, it serves as a nice archive of what has been completed in recent years.
Reply With Quote
     
     
  #9  
Old Posted Aug 10, 2015, 12:10 AM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,495
So I moved the following to U/C:

- Marriott Marquis
- 1333 S Wabash

Edit: 'Recently Completed' list re-added towards end of rundown, with new additions only as they are completed, moving forward:

- Hyatt Place
- Gateway Tower, West Loop


Thanks for all of the information.
__________________
Don't be shy. Step into the light.

Last edited by sentinel; Aug 10, 2015 at 12:25 AM.
Reply With Quote
     
     
  #10  
Old Posted Aug 10, 2015, 12:54 AM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,957
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #11  
Old Posted Aug 10, 2015, 4:34 AM
Tom In Chicago's Avatar
Tom In Chicago Tom In Chicago is offline
Moderator
 
Join Date: Jul 2001
Location: Sick City
Posts: 6,011
Hilton Garden Inn is completed and open for business. . .

. . .
__________________
Tom in Chicago
. . .
Near the day of Purification, there will be cobwebs spun back and forth in the sky.
Reply With Quote
     
     
  #12  
Old Posted Aug 10, 2015, 2:44 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 7,025
Near New City - 8/4

The name of this one always escapes me.
__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #13  
Old Posted Aug 10, 2015, 2:49 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,495
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #14  
Old Posted Aug 10, 2015, 3:03 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 7,025
108 N Jefferson 7/28





__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #15  
Old Posted Aug 10, 2015, 3:11 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,957
Quote:
Originally Posted by sentinel View Post
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
From above re: 750 N Hudson:

Quote:
Originally Posted by LouisVanDerWright View Post
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #16  
Old Posted Aug 10, 2015, 3:16 PM
munchymunch's Avatar
munchymunch munchymunch is offline
MPLSXCHI
 
Join Date: Feb 2014
Location: Omicron Persei 8
Posts: 913
Can we include RUMORED projects like 1000 s state, and the SAIC tower? Also can you add River South.

Thanks for the new thread.
__________________
"I don't want to be interesting. I want to be good." -Ludwig Mies van der Rohe
Reply With Quote
     
     
  #17  
Old Posted Aug 10, 2015, 4:11 PM
Jibba's Avatar
Jibba Jibba is offline
Registered User
 
Join Date: Mar 2008
Location: Chicago
Posts: 2,403
Looks great sentinel.

FYI, rendering for 61 Erie is incorrect (the drawing for 162 W Superior is shown for its entry).
Reply With Quote
     
     
  #18  
Old Posted Aug 10, 2015, 5:03 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 2,957
I guess 905 N Orleans was approved by the city:



http://www.chicagoarchitecture.org/2...-goes-bye-bye/

I think that needs to be added to the proposals list.
Reply With Quote
     
     
  #19  
Old Posted Aug 10, 2015, 5:51 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Chicago
Posts: 2,495
^^^I saw that, but are we sure this one is different from 915 N Orleans, for which we already have an entry? Or is it the same project with an address snafu and a slightly modified design? Hmmmmm...


Also, thanks for the note Jibba. Will update soon...
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #20  
Old Posted Aug 10, 2015, 6:05 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 7,025
200 N Mich - getting close to the top


7/21


7/22


8/04


8/07
__________________
Harry C --- Picassa ---- PrairieSchool Traveler
Curbed Chicago
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:44 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2016, vBulletin Solutions, Inc.