Quote:
Originally Posted by Stormer
|
Centre Point was built in 1978-79. I was the first tenant on the 18th floor when I moved on on October 1st 1979. They finished the suites on floors 2-10 first and then 11-19. It is one of, if not THE ugliest, hi-rises in Regina. I am not a fan of pre-fab concrete buildings from that era. Con-Force built a lot of pre-fabs in Regina during the 70's and 80's including City Hall and South Broad Plaza to name two. At least City Hall doesn't look too bad with its white quartz aggregate.