Smile NEW YORK | 2 Grand St (Domino Redevelopment) | 369 FT | 35 FLOORS

Sounds like the first building within the Domino Sugar Plant Redevelopment can have its own thread-- we can then individually move it to U/C when necessary.


Domino Sugar Plant Redevelopment:
Phase 1 -- 2 Grand Street


New York YIMBY:

Permits Filed: 2 Grand Street
BY: NIKOLAI FEDAK ON JUNE 3RD 2014 AT 6:00 AM


Domino Redevelopment, Phase 1 -- 2 Grand Street at far left, image by SHoP

Quote:
Now that Two Trees’ plan for the Domino Redevelopment has passed through the City Council, work on the site’s new towers can finally begin, and the first permits are up for phase one, at 2 Grand Street. SHoP is the design architect, while Ismael Leyva is serving as the architect of record.

2 Grand Street will become a substantial addition to the Williamsburg waterfront, totaling 785,888 square feet, the bulk of which will be residential. At the base, 11,018 square feet will be occupied by ground-floor retail, while 75,145 square feet will be dedicated to a ‘community facility.’

The remaining space will be split between 658 residences, and the tower will stand 35 stories and 369 feet tall. Height and affordability have both been contentious topics in the neighborhood, and ironically, many proponents of ‘affordable’ housing also favor prohibitive limits on density.

If prices on market-rate housing are to stop rising, then supply must rise to meet demand. The current state of ‘affordable’ 80/20 housing is defined by lotteries and luck, ultimately acting as a distraction from the larger problem affecting the vast majority of New Yorkers.

While the boondoggle of Domino’s final days traversing ULURP resulted in 40 additional ‘affordable’ units — for a total of 700 — the entirety of the redevelopment will be still be beneficial, adding 1,582 market rate units. The relatively large bump may temporarily satisfy local demand, though the pressure on housing across Brooklyn is increasingly severe; since 2010, the borough’s population has increased by 82,558, yet only 5,358 new housing units have been delivered.

Domino is a major step in the continued riverfront revitalization in Williamsburg, and the recent push for mass-transit along the East River waterfronts of Brooklyn and Queens will hopefully come with zoning for more generous development.

Completion of 2 Grand Street is likely within the next two to three years, while the project’s full, 3.3 million square foot build-out may take upwards of a decade.

Domino Redevelopment, 2 Grand Street at far left — image by SHoP


Domino Redevelopment, base of 2 Grand Street at far right — image by SHoP



As of May 2014...

The building will go on the far, already cleared site:


Curbed NY

The site in the foreground:


Curbed NY
__________________
“If I have done the public any service, it is due to my patient thought.” ― Isaac Newton

~ My Stamford, CT Thread ~~ My Danbury, CT Thread ~
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:40 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.