View Single Post
  #68  
Old Posted Jul 16, 2013, 9:25 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 3,991
Expect the North Bound lanes of the Norwood bridge to be closed in the next year or two for resurfacing. The city currently has an open request for engineering services to create a construction tender for replacement / repair of the top surface of the north bound lanes of the Norwood Bridge.

Form the request:

"The bridge deck surface is in poor condition with rusted steel fibers at the surface and numerous pop outs and spalls throughout. There is some evidence of insufficient cover on the top layer of reinforcing steel. Some locations have been patched."
Reply With Quote