On Friday the Perimeter was extremely icy. Granted I was on a few hours after the accident but doing 80 was definitely towards the top end of what you could safely do and even then if you needed to hit your brakes quickly it would send you sliding. You needed to drive very defensively and leave a wide margin of space between vehicles.
Reply With Quote
     
     
  #2442  
Old Posted Dec 16, 2019, 4:45 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by bomberjet View Post
On a semi-related note. I believe there is an RFP out for the 59N over floodway bridge. Had some inquiries which related to that area of the highway. The Province is rebuilding that one with some innovative solution they touted in a presser recently.
Any idea when they are going to fix/replace the overpass on the Trans Canada on the west side of Portage la Prairie, having a huge section of the overpass missing and only one lane operational make us look like a real backwater!

And still can't believe #1 at #16 still hasn't been grade separated with the volume of traffic both see!
Reply With Quote
     
     
  #2443  
Old Posted Dec 16, 2019, 4:48 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,704
Quote:
Originally Posted by rrskylar View Post
Any idea when they are going to fix/replace the overpass on the Trans Canada on the west side of Portage la Prairie, having a huge section of the overpass missing and only one lane operational make us look like a real backwater!

And still can't believe #1 at #16 still hasn't been grade separated with the volume of traffic both see!
Design next year, construction 2021.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #2444  
Old Posted Dec 16, 2019, 5:14 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by Biff View Post
Design next year, construction 2021.
Why am I getting this feeling again...

Reply With Quote
     
     
  #2445  
Old Posted Dec 16, 2019, 8:51 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 5,881
Wasn't grade separation for HYW1/16 one of the projects killed by the 99 flood? (The other being Lag/59).
Reply With Quote
     
     
  #2446  
Old Posted Dec 16, 2019, 9:25 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,707
99 or the 09/11 floods? Or both. Either way, yes it was said the were cancelled due to flooding expenditures. Nothing has really come up since then.
Reply With Quote
     
     
  #2447  
Old Posted Dec 17, 2019, 2:51 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 8,704
.....
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #2448  
Old Posted Dec 31, 2019, 10:46 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,233
https://winnipeg.ctvnews.ca/i-though...pect-1.4746864

Hit-and-run 2 days ago. Thankfully no fatality.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #2449  
Old Posted Jan 29, 2020, 1:25 AM
WildCake WildCake is online now
Registered User
 
Join Date: May 2016
Posts: 822
Manitoba infrastructure has a new PDF document outlining further safety improvements proposed for Perimeter, set for this summer. This is a download link to a zip file that contains the PDF


https://www.gov.mb.ca/mit/hpd/pth100...afety_plan.zip

Here’s a summary:

-Run a new service road on the west side of Perimeter from Oak Bluff to Wilkes.

-Close most (all?) dirt roads currently accessing Perimeter between Wilkes and Kenaston.

-Build service road from Brady rd to Waverley and then close Brady rd (already publicly announced).

-Run a service road from Aimes road to Ste Anne’s road (including railroad and seine river crossings), and subsequent closure of access to Perimeter. The only opening left of that cluster of 4 roads would be Sumka rd.

-Close Plessis access to Perimeter and extend Plessis south of Perimeter to the interchange of 59 and the floodway.
Reply With Quote
     
     
  #2450  
Old Posted Jan 29, 2020, 1:33 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,233
Quote:
Originally Posted by WildCake View Post
Manitoba infrastructure has a new PDF document outlining further safety improvements proposed for Perimeter, set for this summer. This is a download link to a zip file that contains the PDF


https://www.gov.mb.ca/mit/hpd/pth100...afety_plan.zip

Here’s a summary:

-Run a new service road on the west side of Perimeter from Oak Bluff to Wilkes.

-Close most (all?) dirt roads currently accessing Perimeter between Wilkes and Kenaston.

-Build service road from Brady rd to Waverley and then close Brady rd (already publicly announced).

-Run a service road from Aimes road to Ste Anne’s road (including railroad and seine river crossings), and subsequent closure of access to Perimeter. The only opening left of that cluster of 4 roads would be Sumka rd.

-Close Plessis access to Perimeter and extend Plessis south of Perimeter to the interchange of 59 and the floodway.
That sounds good.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #2451  
Old Posted Jan 29, 2020, 11:41 AM
Spocket's Avatar
Spocket Spocket is offline
Back from the dead
 
Join Date: Feb 2006
Location: Edmonton
Posts: 3,504
It's nice but when are they going to actually build the grade separations?
__________________
Giving you a reason to drink and drive since 1975.
Reply With Quote
     
     
  #2452  
Old Posted Jan 29, 2020, 2:42 PM
WildCake WildCake is online now
Registered User
 
Join Date: May 2016
Posts: 822
Quote:
Originally Posted by Spocket View Post
It's nice but when are they going to actually build the grade separations?
Whenever the current government goes from cuts to sustainable spending.

The proposed changes at least address many of the small issues, leaving only the big issues left to tackle once funding is allocated to interchanges.
Reply With Quote
     
     
  #2453  
Old Posted Jan 29, 2020, 2:53 PM
dmacc dmacc is offline
Registered User
 
Join Date: Dec 2017
Location: Winnipeg
Posts: 1,643
Isn't the government still in the input stage?
Reply With Quote
     
     
  #2454  
Old Posted Jan 29, 2020, 5:32 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,707
All that stuff is good news.

The Province just needs to get a program in place for funding the major works. Hopefully Brian P talked with the PM when they were in town regarding this topic.
Reply With Quote
     
     
  #2455  
Old Posted Jan 29, 2020, 5:54 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,233
Quote:
Originally Posted by bomberjet View Post
All that stuff is good news.

The Province just needs to get a program in place for funding the major works. Hopefully Brian P talked with the PM when they were in town regarding this topic.
Andy6 and I are gonna sound like broken records but sure why not...

Add TCH twinning to the list too.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #2456  
Old Posted Jan 29, 2020, 6:25 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,707
That'll be a fairly major project through the Whiteshell due to terrain. Since the highway is not twinned for a considerable distance within Ontario, I don't suspect anything will happen until theres actual movement from Onatrio.
Reply With Quote
     
     
  #2457  
Old Posted Jan 29, 2020, 6:30 PM
OTA in Winnipeg's Avatar
OTA in Winnipeg OTA in Winnipeg is offline
Registered User
 
Join Date: Mar 2016
Location: Silver Heights
Posts: 1,614
Reply With Quote
     
     
  #2458  
Old Posted Jan 29, 2020, 6:34 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 13,707
They've been working on that for probably a decade now. We'll see if they actually get some approvals.

Edit the link says since 2009 in its current form. They also say construction should be underway by now.
Reply With Quote
     
     
  #2459  
Old Posted Jan 29, 2020, 6:34 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,233
Quote:
Originally Posted by bomberjet View Post
That'll be a fairly major project through the Whiteshell due to terrain. Since the highway is not twinned for a considerable distance within Ontario, I don't suspect anything will happen until theres actual movement from Onatrio.
I was hoping for both provinces to start working at the same time. Lol, think of us like B.C. Parks Canada finished twinning AB-1 through Banff in 2014 but didn’t start working on the first 6 km in B.C. through Yoho NP until 2016. (It was finished late 2018.) From there, it’s another 40+ km until the 4 lanes through Kicking Horse Canyon.
Quote:
Originally Posted by OTA in Winnipeg View Post
We were supposed to start last year. Even Shoal Lake 40’s Freedom Road has been completed.

Anyway that’s my rant.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #2460  
Old Posted Jan 29, 2020, 6:47 PM
OTA in Winnipeg's Avatar
OTA in Winnipeg OTA in Winnipeg is offline
Registered User
 
Join Date: Mar 2016
Location: Silver Heights
Posts: 1,614
^^^Yeah, says beyond 2021 in one of those documents.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 7:50 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.