  #61  
Old Posted May 26, 2014, 9:18 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by TannerF View Post
I couldn't help to notice that the map associated with this link adds a little clarification as to some of the at grade crossings. It seems only the crossing at Courtney will be all directions and the one south of wascana village and also at centre road will be right turn only.

http://www.saskbuilds.ca/projects/Re...022%202014.pdf
Thanks for posting. I am liking the right turn only in a few locations. Also to answer your question about the "at grade" intersections. I will suspect that these will just be stop signs with acceleration lanes. I am also curious to see the new layout of the Dewdney / Hub road interchange. It says ramps only off the north side of the dewdney. I hope this means something similar to this.

https://www.google.ca/maps/@53.43674.../data=!3m1!1e3

But am a definitely happy that there will be a service interchange at 9th North! And only right turns at Pinky / Hill Ave

Another thing. Looks like this will be 4-lane divided along the whole route. Function drawings will confirm this. But one can only hope that it will be. More $$$ but better for safety especially when City / Truck traffic are both being accommodated.

One more thing that needs clarification are the rail grade seperation. I know that the CP is already being done. But what about the two CN Lines in the NW that will need to be crossed?

Last edited by North_Regina_Boy; May 26, 2014 at 9:32 PM.
Reply With Quote
     
     
  #62  
Old Posted May 26, 2014, 11:19 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,209
Quote:
Originally Posted by jw6969 View Post
Highway 48 should be rerouted to 46 instead of just dead ending where it is now.
Frankslake Rd. to White Butte is already a fully paved connector. Perhaps a slight re-alignment at #1 is all that is required.
Reply With Quote
     
     
  #63  
Old Posted May 27, 2014, 1:52 AM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
So do those right-turn only intersections prohibit cross-traffic? They'd essentially be interchanges without an overpass, just on- and off-ramps? Seems like an acceptable solution. That leaves just two full at-grade intersections, and I can sort of understand Armour Road. But Courtney Street??? That would come out if it was up to me.
Reply With Quote
     
     
  #64  
Old Posted May 27, 2014, 2:07 AM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by jw6969 View Post
Highway 48 should be rerouted to 46 instead of just dead ending where it is now.
I believe the long-term plan for an outer, outer bypass has it head south from the terminus of Hwy 46. It would cross 48.
Reply With Quote
     
     
  #65  
Old Posted Jun 22, 2014, 4:50 AM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Does anyone know what could potentially go in in the space between Tower Road and the Bypass? It looks like there's about 800m between Tower Road and the tracks. Surely that won't all be taken up by the Bypass. Potential commercial development?
Reply With Quote
     
     
  #66  
Old Posted Jun 22, 2014, 2:31 PM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by jigglysquishy View Post
Does anyone know what could potentially go in in the space between Tower Road and the Bypass? It looks like there's about 800m between Tower Road and the tracks. Surely that won't all be taken up by the Bypass. Potential commercial development?
I believe Tower Road is designated as a service road for the bypass. So yes, commercial would be my guess.
Reply With Quote
     
     
  #67  
Old Posted Jun 23, 2014, 12:12 AM
sask1982's Avatar
sask1982 sask1982 is offline
Registered User
 
Join Date: Sep 2002
Location: Regina, Saskatchewan
Posts: 909
I'm anticipating (in a positive way) where this project will be one year from now.
Reply With Quote
     
     
  #68  
Old Posted Jun 26, 2014, 2:40 AM
BrutallyDishonest BrutallyDishonest is offline
Closed account
 
Join Date: Oct 2013
Posts: 175
Quote:
Originally Posted by sask1982 View Post
I'm anticipating (in a positive way) where this project will be one year from now.
Honestly, I don't think you'll see too much physical activity in one year. They would really have to accelerate the land acquisitions.
Reply With Quote
     
     
  #69  
Old Posted Jul 3, 2014, 5:55 AM
TannerF TannerF is offline
Registered User
 
Join Date: Nov 2013
Posts: 101
Appraisals are close to being done and meetings with offers are supposed to be scheduled soon. They are also going to be out doing soil sampling and hydrovacing over pipelines to find exact locations according to a phone call I got today.
Reply With Quote
     
     
  #70  
Old Posted Jul 10, 2014, 12:37 AM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Confirmation of 4-lane of entire route.

Project Description

The bypass plan features new roads, service roads and overpasses that will make traveling around Regina faster and safer. A twinned highway begins at Highway 11 northwest of Regina, and continues south to Highway 1.

The bypass route runs approximately 5 km south of Highway 1, past Tower Road, before re-connecting with Highway 1 on the east of Regina. The project will also include three overpasses at Pilot Butte Access Road, Highway 48 at White City, and Highway 46 at Balgonie.

The contractor, once selected, will design, build, finance, operate and maintain the project over a 30-year period. Construction of the bypass is anticipated to take three and a half years and the P3 model is expected to deliver the project on time and on budget.

Source: http://www.p3canada.ca/en/about-p3s/...ypass-project/
Reply With Quote
     
     
  #71  
Old Posted Jul 10, 2014, 4:09 PM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
3.5 years is MOST expedient!!! (And hard to believe!)

Watch out for an all-out invasion of earth moving equipment in the Regina area!
Reply With Quote
     
     
  #72  
Old Posted Jul 10, 2014, 4:17 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by SkydivePilot View Post
3.5 years is MOST expedient!!! (And hard to believe!)

Watch out for an all-out invasion of earth moving equipment in the Regina area!
Reply With Quote
     
     
  #73  
Old Posted Jul 10, 2014, 8:44 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Their actual report also claims that all three of the White City/Pilot Butte/Balgonie interchanges will be done summer 2017. So it'll be opening in sections.
Reply With Quote
     
     
  #74  
Old Posted Jul 10, 2014, 8:55 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by jigglysquishy View Post
Their actual report also claims that all three of the White City/Pilot Butte/Balgonie interchanges will be done summer 2017. So it'll be opening in sections.
Correct, looks like the entire thing however should be opened by 2018. Which will be awesome! And Stage 2 of the West bypass is nearly complete.

Stage 3 would appear to be "bypassed" pun intended, and stages 4 (4 being increased to 4-lane entire distance) and 5 be done concurrently.

http://www.highways.gov.sk.ca/adx/as...edule+2010.pdf

If they are to meet the 2018 schedule. I hope this includes Overpasses at both CN rail lines (Moose Jaw sub and Craik Sub)
Reply With Quote
     
     
  #75  
Old Posted Jul 22, 2014, 7:37 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Cost Estimate of the Bypass:
Base cost provided by Gov't of Saskatchewan = $1.2B
Numbers based on previous construction costs from comparable structures. Example Lewvan Highway 1 (Service Interchange = $35M)

Systems Interchange at Highway 11 = $50M-75M
4-Lane Bridge over CN Craik Sub = $10M-15M
At Grade (All-turns) intersection at Armour Road = $5M
Overpass (Service Interchange) at 9th North = $35M
4-Lane Bridge over Wascana Creek = $10M
4-Lane Bridge over CN Moose Jaw Sub = $10M-15M
Overpass (Service Interchange) at Dewdney = $35M
Systems Interchange at Hub Access Road = $50M-75M
4-Lane Bridge over CP Main Line = Completed
Systems Interchange at Trans-Canada Highway West = $75M-100M
At Grade (All-turns) intersection at Courtney = $5M
Overpass (Service Interchange) at Highway 6 = $35M
4-Lane Bridge over Wascana Creek = $10M
Right Turn only Access to Highway at Fleet Street = $5M
Overpass (Service Interchange) at Highway 33 = $35M
Systems Interchange at Trans-Canada Highway East = $75-100M
Overpass (Service Interchange) at Great Plains Road = $35M
Overpass (Service Interchange) at Highway 48 = $35M
Overpass (Service Interchange) at Highway 46 = $35M

Total for Overpasses and Bridges (Maximum) = $660M
Total for Kilometers of 4-Lane Highway at $2M/km = $100M
Total for Additional Lanes at $1M/km = $5M
Land Acquisition = $150-200M

Estimation Total = $960M
Contingency Estimate = $240M
Reply With Quote
     
     
  #76  
Old Posted Jul 22, 2014, 7:41 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,209
Quote:
Originally Posted by North_Regina_Boy View Post
Cost Estimate of the Bypass:
Base cost provided by Gov't of Saskatchewan = $1.2B

Systems Interchange at Highway 11 = $50M-75M
4-Lane Bridge over CN Craik Sub = $10M-15M
At Grade (All-turns) intersection at Armour Road = $5M
Overpass (Service Interchange) at 9th North = $35M
4-Lane Bridge over Wascana Creek = $10M
4-Lane Bridge over CN Moose Jaw Sub = $10M-15M
Overpass (Service Interchange) at Dewdney = $35M
Systems Interchange at Hub Access Road = $50M-75M
4-Lane Bridge over CP Main Line = Completed
Systems Interchange at Trans-Canada Highway West = $75M-100M
At Grade (All-turns) intersection at Courtney = $5M
Overpass (Service Interchange) at Highway 6 = $35M
4-Lane Bridge over Wascana Creek = $10M
Right Turn only Access to Highway at Fleet Street = $5M
Overpass (Service Interchange) at Highway 33 = $35M
Systems Interchange at Trans-Canada Highway East = $75-100M
Overpass (Service Interchange) at Great Plains Road = $35M
Overpass (Service Interchange) at Highway 48 = $35M
Overpass (Service Interchange) at Highway 46 = $35M

Total for Overpasses and Bridges (Maximum) = $660M
Total for Kilometers of 4-Lane Highway at $2M/km = $200M
Total for Additional Lanes at $1M/km = $5M
Land Acquisition = $150-200M

Estimation Total = $1B-60M
Contingency Estimate of $140M
100KM of 4-lane highway? Wow

Also what is the Total? $1.06B?
Reply With Quote
     
     
  #77  
Old Posted Jul 22, 2014, 7:44 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Stormer View Post
100KM of 4-lane highway? Wow

Also what is the Total? $1.06B?
Sorry see editied above. it is only 50km of new highway I did the math backwards :p
Reply With Quote
     
     
  #78  
Old Posted Jul 23, 2014, 9:10 AM
blacktrojan3921's Avatar
blacktrojan3921 blacktrojan3921 is offline
Regina rhymes with fun!
 
Join Date: Jun 2010
Location: Regina, SK
Posts: 887
I'm more curious as to what they'll name the bypass lol. Since we got a plethora of approved names for streets, I'm sure there is a few that would be perfect to name portions of the bypass, or the entire thing altogether.
Reply With Quote
     
     
  #79  
Old Posted Jul 23, 2014, 2:32 PM
Migs Migs is offline
BANNED
 
Join Date: Dec 2006
Location: Regina, Sk, Canada
Posts: 3,774
Quote:
Originally Posted by blacktrojan3921 View Post
I'm more curious as to what they'll name the bypass lol. Since we got a plethora of approved names for streets, I'm sure there is a few that would be perfect to name portions of the bypass, or the entire thing altogether.
Roughriders Expressway!
Reply With Quote
     
     
  #80  
Old Posted Jul 23, 2014, 3:56 PM
Festivus Festivus is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,156
Quote:
Originally Posted by blacktrojan3921 View Post
I'm more curious as to what they'll name the bypass lol. Since we got a plethora of approved names for streets, I'm sure there is a few that would be perfect to name portions of the bypass, or the entire thing altogether.
Maple Valley Green Grove Greens Heights F.W. Hill Memorial Expressway.

Combine all the crappy generic names the city/developers go with nowadays with the absurd long memorial names that are also popular for no good reason, and throw in some patronage to the Hills also for no reason.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:43 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.