Quote:
Originally Posted by foxmtbr
I can't wait to see this go up!
|
Conceivably should all four projects (Aura, U.S. Bank Tower, "The Towers" and 500 CM) be under construction at the same time, (as they should be) you'll have 5 cranes within 3 blocks of each other. Should be an exciting year there...
Given the level of activity underway, Capitol Mall will finally be a showcase for California and Sacramento.