Quote:
Originally Posted by tascalisa
Amen. Imagine Vesta, 5Pts Tower, Childrens' Deck, and Midtown Ph3 being under construction all at the same time?!
|
UAB is supposed to start construction in August on the College of Arts and Science building down on 10th Avenue and 14th Street South, not tall but still a rather large building at 160,000 square feet. It will be "L" shaped with 1 side at 5 floors and the other at 4 floors. And it will finish out the frame for the Campus Green.