A TTC Streetcar map with a few U/C connections like into the Distillery?Canary Districts and proposed lines.

Posted by: Andrew Alfred-Duncan
Reply With Quote
     
     
  #2  
Old Posted Apr 23, 2015, 12:00 AM
MonkeyRonin's Avatar
MonkeyRonin MonkeyRonin is online now
¥ ¥ ¥
 
Join Date: Sep 2006
Location: Vancouver
Posts: 9,999
Quote:
Originally Posted by TorontoDrew View Post
A TTC Streetcar map with a few U/C connections like into the Distillery?Canary Districts and proposed lines.

Posted by: Andrew Alfred-Duncan

This looks great. The TTC really ought to run maps like these in the streetcars.
__________________
Reply With Quote
     
     
  #3  
Old Posted Apr 23, 2015, 2:50 PM
caltrane74's Avatar
caltrane74 caltrane74 is online now
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,187
Thank god, the TTC didn't get rid of the streetcars. The NEW Machines are almost as comfortable as subways, just slower. We got lucky here!!!
Reply With Quote
     
     
  #4  
Old Posted Apr 20, 2015, 5:43 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,521
It played out a little differently in Kingston.

Our streetcar system was largely a failure from the get go. Kingston started up a horse-drawn streetcar system (horses on tracks pulling streetcar cabs, essentially), in the 1870s (I wanna say 1878) followed by a full fledged electric streetcar system in 1891.

It was never much of a success. Back in those days, Kingston was a small enough city that one could walk from point A to point B pretty much anywhere in the city in a half hour or less, and there was never a lot of money in the city, so most people cheaped out and just walked everywhere instead of paying the streetcar fare. The city constantly gave it loans (many of which were forgiven) to cover its costs. When a fire broke out in the 1930s and burned down the garage, the city just gave up rather than buy more cars, and buses were brought in.
Reply With Quote
     
     
  #5  
Old Posted Apr 20, 2015, 7:14 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,664
Quote:
Originally Posted by 1overcosc View Post
It played out a little differently in Kingston.

Our streetcar system was largely a failure from the get go. Kingston started up a horse-drawn streetcar system (horses on tracks pulling streetcar cabs, essentially), in the 1870s (I wanna say 1878) followed by a full fledged electric streetcar system in 1891.

It was never much of a success. Back in those days, Kingston was a small enough city that one could walk from point A to point B pretty much anywhere in the city in a half hour or less, and there was never a lot of money in the city, so most people cheaped out and just walked everywhere instead of paying the streetcar fare. The city constantly gave it loans (many of which were forgiven) to cover its costs. When a fire broke out in the 1930s and burned down the garage, the city just gave up rather than buy more cars, and buses were brought in.
That is the story of a lot of smaller city streetcar systems. Oshawa, Guelph, Peterborough, even Woodstock IIRC all used to have streetcar systems. They were never really profitable and were usually ripped out earlier than the larger city systems, which largely lasted until the 1950's, except for Toronto which was planned to last to 1980, if it wasn't saved.
Reply With Quote
     
     
  #6  
Old Posted Apr 21, 2015, 5:21 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Transferred. Construction starting 2018.

Quote:
Originally Posted by Innsertnamehere View Post
Ontario Newsroom

News Release

Ontario Moving Forward with Hurontario-Main Light Rail Transit Project

April 21, 2015

Project to Bring 23 KM, 26 Stops of Light Rail Transit to Mississauga, Brampton

As part of the largest infrastructure investment in Ontario's history, Ontario is moving ahead with the Hurontario-Main Light Rail Transit (LRT) project.

This LRT is a new public transit project, led by Metrolinx, that will bring 23 kilometres of rapid transit to Mississauga and Brampton. The LRT line is proposed to have 26 stops, including three stops within downtown Mississauga and two stops in downtown Brampton. The service will move more people faster through these corridors than the existing bus service.

Through the Moving Ontario Forward plan the government is investing in priority rapid transit projects that will connect to the GO Transit network and other transit systems across the Greater Toronto and Hamilton Area (GTHA). These priority rapid transit projects will increase transit ridership, reduce travel times, manage congestion, connect people to jobs, and improve the economy.

On April 16, 2015, Ontario moved ahead with its plan to unlock the value of certain public assets. This will provide the province with approximately $4 billion to build new transit and other priority infrastructure projects through Moving Ontario Forward.

Investing more than $130 billion over 10 years in public infrastructure ­-- the largest infrastructure investment in the province's history -- is part of the government's plan for Ontario. The four-part plan is building Ontario up by investing in people's talents and skills, building new public infrastructure like roads and transit, creating a dynamic, innovative environment where business thrives, and building a secure retirement savings plan.


QUICK FACTS

The province’s Moving Ontario Forward plan will make $31.5 billion available over the next 10 years for investments in priority infrastructure projects across the province and is expected to support over 20,000 jobs per year, on average, in construction and related industries.
Under Moving Ontario Forward, around $16 billion is being allocated to transit and transportation projects in the Greater Toronto and Hamilton Area (GTHA), and about $15 billion available for investment in roads, bridges, transit and other critical infrastructure in the rest of the province.
The Hurontario-Main LRT will provide a crucial link between many of the region’s existing transit lines, including GO Transit’s Kitchener, Milton and Lakeshore West rail lines, Brampton Züm, and the Mississauga Transitway BRT.






Last edited by SkahHigh; Apr 21, 2015 at 7:28 PM.
Reply With Quote
     
     
  #7  
Old Posted Apr 21, 2015, 8:47 PM
caltrane74's Avatar
caltrane74 caltrane74 is online now
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,187
Notice that Light Rail Transit, doesn't mean Light Rapid Transit.
Reply With Quote
     
     
  #8  
Old Posted Apr 21, 2015, 10:55 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,203
Does the transit demand for the Hurontario corridor really justify the cost of an LRT system? I don't live there but it seems to me like most ridership is going to and from central Toronto, not between Brampton and Mississauga. It just seems strange that they're building cheaper BRT for what seems like a more congested corridor than the Hurontario line. Please excuse any ignorance. Like I said, I don't live there.
Reply With Quote
     
     
  #9  
Old Posted Apr 22, 2015, 2:59 PM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 4,792
Quote:
Originally Posted by Hybrid247 View Post
Does the transit demand for the Hurontario corridor really justify the cost of an LRT system? I don't live there but it seems to me like most ridership is going to and from central Toronto, not between Brampton and Mississauga. It just seems strange that they're building cheaper BRT for what seems like a more congested corridor than the Hurontario line. Please excuse any ignorance. Like I said, I don't live there.
In the mid-90s, Hurontario overtook Yonge, Dundas, and Burnhamthorpe to become the busiest bus corridor in Mississauga and the second busiest in the 905. A few years later, the 19 Hurontario also achieved higher ridership than 1/5/10 King/Delaware/Beeline in Hamilton and so it's been the busiest bus corridor in the 905 for over a decade now.
Reply With Quote
     
     
  #10  
Old Posted Apr 21, 2015, 11:42 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,521
From what I gather, the Hurontario-Main corridor has seen a big boost in ridership in the past few years. I've heard it's the busiest bus route in the GTA outside Toronto.

Like Kitchener-Waterloo's LRT, this also has urbanization & development as a big push.

What makes this one particularly valuable, though, is the connection to GO RER at either end, especially important as the Milton GO route is not going to receive RER-level service for quite a ways into the future.
Reply With Quote
     
     
  #11  
Old Posted Apr 22, 2015, 12:24 AM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,383
I actually just wrote a brief paper on this; we're still transitioning between two different ways of conceiving of transportation and transit planning - on one hand, the technocratic approach (not derogatory, that's just a loose translation from the French terms) and the post-technocratic approach.

The first sees transportation planning as a process of projecting and building infrastructure in a very detached and impartial way. This is still the norm for most routine road projects or service upgrades.
The latter sees transportation planning essentially as a powerful tool for reshaping the city. Though we've seen this since the 70s here and there around North America, it's becoming more and more common with projects whose main goal is more about redefining or shaping the city rather than responding to existing demand.

I tend to agree more with the latter if only because the idea that you can objectively meet demand without creating it has been thoroughly discredited in the past half century through both evidence and experience. However, it's rarely just one or another.

The Hurontario-Main corridor already has enough ridership to justify investment, but perhaps more importantly, it's meant to concentrate development and activity to hopefully create a "critical mass" of urbanity in Mississauga's developing 'downtown' (it'll be a while until I remove those quotation marks).
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #12  
Old Posted Apr 22, 2015, 12:33 AM
thegx thegx is offline
Registered User
 
Join Date: Feb 2012
Posts: 320
Quote:
Originally Posted by SkahHigh View Post
Since we have a few LRT/rapid transit projects under construction right now and some more planned in the future, I suggest we make a specific thread where users can post construction updates of listed projects instead of doing it in one big transit thread with other modes.

Here's the list.

Under construction
  • Edmonton - NAIT line (ETS) - 3 stations - 3.3km - 2015
  • Vancouver - Evergreen line (TransLink) - 6 stations - 11km - 2016
  • Kitchener-Waterloo - Ion (Grand River Transit) - 16 stations - 19km - 2017
  • Toronto - Yonge/Spadina Extension (TTC) - 6 stations - 8.6km - 2017
  • Ottawa - Confederation line (OC Transpo) - 13 stations - 12.5km - 2018
  • Toronto - Eglinton Crosstown (Metrolinx) - 25 stations - 19km - 2020
It's called the Metro Line not the NAIT line.
Reply With Quote
     
     
  #13  
Old Posted Apr 22, 2015, 2:21 PM
kwoldtimer kwoldtimer is online now
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 23,731
Quote:
Originally Posted by thegx View Post
It's called the Metro Line not the NAIT line.
And it's "ion", not "Ion".
Reply With Quote
     
     
  #14  
Old Posted Apr 22, 2015, 2:30 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by kwoldtimer View Post
And it's "ion", not "Ion".
The actual name is ION.

http://rideion.tumblr.com
Reply With Quote
     
     
  #15  
Old Posted Apr 22, 2015, 2:46 PM
kwoldtimer kwoldtimer is online now
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 23,731
Quote:
Originally Posted by SkahHigh View Post
The actual name is ION.

http://rideion.tumblr.com
You're right - I hadn't noticed before that "ion" is only used for the logo.
Reply With Quote
     
     
  #16  
Old Posted Apr 22, 2015, 2:39 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 9,801
Will the Hurontario-Main Light Rail Transit Project have the same track gauge as the Eglington Cross-Town Line?


Also here is a good video that explains why the boring machines were lifted out at Eglington West and dropped back down east of the subway station.

Video Link
Reply With Quote
     
     
  #17  
Old Posted Apr 24, 2015, 2:41 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Encouraging news from Montreal (finally)

Two days ago at the National Assembly, we learned from Municipal Affairs minister Pierre Moreau that the Blue line extension project office will release it's final report in December 2015, and that part of funding might come from the Caisse. At that time, we will learn what mode will be used (Metro, tram-train, elevated light rail).

Here's a reminder of what the extension towards Anjou looks like:


http://i2.wp.com/lenavet.ca/wp-conte...ize=1110%2C453
Reply With Quote
     
     
  #18  
Old Posted Apr 24, 2015, 3:05 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 16,891
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/306346...h/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0...lhxXFxuAey_q6Q
Reply With Quote
     
     
  #19  
Old Posted Apr 24, 2015, 3:10 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by Metro-One View Post
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
They wouldn't switch. The government wants the most effective and less expensive system available. If that means a tram line going East and connecting at Saint-Michel station to serve more people at a lesser price they might consider it. The idea of imposing a transfer is pretty stupid though.

The extension was announced by the PQ in 2012 and is now being delayed with the Liberals. Although I think something will be completed before the end of 2020.
Reply With Quote
     
     
  #20  
Old Posted Apr 24, 2015, 3:18 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,483
Quote:
Originally Posted by Metro-One View Post
Why would they switch technologies? Is it not just a 5 station extension of the existing line, and therefore should have the exact same technology?
+1

That seems a bit half-assed and a good way to discourage ridership. Why not reduce the extension by one stop and use the savings to make it a Metro extension instead of one of the other modes?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 5:50 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.